eskom-arnot-6cf4775bc58ff336.pdf
Summary
A letter from the South African Department of Environmental Affairs to Eskom stating that the postponement application for compliance with the 2015 Minimum Emission Standards for the Arnot Power Station has been placed on hold due to insufficient information.
Key insights
- The Department of Environmental Affairs has placed Eskom's application for a postponement of compliance with the 2015 Minimum Emission Standards for the Arnot Power Station on hold because a preliminary review identified several critical data gaps.
- The specific deficiencies in the application include the absence of current stack emission limits, the lack of a future compliance plan, and inadequate presentation of ambient air quality monitoring data, which lacks time series plots and accurate frequency plots to show trends or pollutant evolution.
- The Department noted that the application provided limited data necessary to conduct an assessment of the health and environmental impacts of PM2.5.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). eskom-arnot-6cf4775bc58ff336.pdf. https://cer.org.za/wp-content/uploads/2014/07/Eskom-Arnot.pdf?x21779
- Chicago
- Centre for Environmental Rights. eskom-arnot-6cf4775bc58ff336.pdf. n.d. https://cer.org.za/wp-content/uploads/2014/07/Eskom-Arnot.pdf?x21779.
- Wikipedia
- {{cite press release |author=Centre for Environmental Rights |title=eskom-arnot-6cf4775bc58ff336.pdf |url=https://cer.org.za/wp-content/uploads/2014/07/Eskom-Arnot.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @misc{centreforenvironmentalrightsndeskomarnot6cf4775bc58ff336pdf, author = {{Centre for Environmental Rights}}, title = {{eskom-arnot-6cf4775bc58ff336.pdf}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2014/07/Eskom-Arnot.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated