annexure-ra10-3acb20cabcb5c6cf.pdf
Summary
This document is an Environmental Impact Assessment (EIA) Report and Environmental Management Programme (EMPr) for the Tormin Mine Extension, prepared by SRK Consulting for MSR. It details the potential environmental impacts of the mine expansion, proposed mitigation measures, and the financial and operational plans for rehabilitation and closure.
Key insights
- The overall closure vision for Tormin Mine is to ensure that operations remain safe, stable, and non-polluting over the long term, allowing the site to integrate with local agricultural, eco-tourism, and economic activities.
- The closure objectives for the mine expansion include concurrent rehabilitation to return the land to near pre-mining capability, ensuring soil stability to prevent erosion, preventing alien plant invasion, and ensuring areas are free-draining and non-polluting.
- The financial provision required for the management and rehabilitation of the Tormin Mine Extension project and its infrastructure is R 13 170 408.23, excluding VAT.
- The financial provision for rehabilitation was calculated using the 2005 DMR Guideline Document for the Evaluation of the Quantum of Closure-Related Financial Provisions Provided by a Mine and will be reviewed annually for adequacy and inflation.
- Rehabilitation success is primarily measured by vegetation cover and structure, with a short- to medium-term goal of restoring self-sustaining perennial vegetation to protect soil and facilitate natural recolonisation by fauna and flora.
- MSR and its contractors must provide environmental awareness training to all site employees during construction, operational, and closure phases, covering waste disposal, fauna and avifauna protection, and EMPr measures.
- The EMPr performance assessment, or audit, is required to be conducted every two years by an external auditor, with the resulting report submitted to the DMR.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). annexure-ra10-3acb20cabcb5c6cf.pdf. https://cer.org.za/wp-content/uploads/2021/01/Annexure-RA10.pdf?x21779
- Chicago
- Centre for Environmental Rights. annexure-ra10-3acb20cabcb5c6cf.pdf. n.d. https://cer.org.za/wp-content/uploads/2021/01/Annexure-RA10.pdf?x21779.
- Wikipedia
- {{cite report |author=Centre for Environmental Rights |title=annexure-ra10-3acb20cabcb5c6cf.pdf |url=https://cer.org.za/wp-content/uploads/2021/01/Annexure-RA10.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{centreforenvironmentalrightsndannexurera103acb20cabcb5c6cfpdf, author = {{Centre for Environmental Rights}}, title = {{annexure-ra10-3acb20cabcb5c6cf.pdf}}, institution = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2021/01/Annexure-RA10.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated