Summary
This briefing, dated 17 July 2014, is a response from Eskom to the South African Department of Environmental Affairs (DEA) regarding a postponement application for the Hendrina Power Station to comply with Minimum Emission Standards (MES). Eskom outlines current stack emission limits, its lack of plans to upgrade the station for certain pollutants, and provides ambient air quality monitoring data showing non-compliance for particulate matter.
Key insights
- Hendrina Power Station's Atmospheric Emission Licence (number 17/4/AEL/MP313/11/16, dated 19 March 2014) specifies stack emission limits for normal operating conditions. For SO2, the maximum release rate is 4000 mg/Nm³ immediately, 3500 mg/Nm³ by 1 April 2015, and 500 mg/Nm³ by 1 April 2020. For NOx, the limits are 1700 mg/Nm³ immediately, 1100 mg/Nm³ by 1 April 2015, and 750 mg/Nm³ by 1 April 2020. For PM, the limits are 100 mg/Nm³ immediately, 75 mg/Nm³ by 1 April 2015, and 50 mg/Nm³ by 1 April 2020.
- Eskom does not intend to upgrade Hendrina Power Station to meet the 'new plant' SO2 emission limit or the old and new plant NOx emission limits. The station, commissioned between 1970 and 1976, is expected to be decommissioned between 2030 and 2036 based on a 60-year life plan, though this depends on national electricity demand.
- Ambient air quality monitoring at the Hendrina station shows that SO2 and NO2 concentrations are generally within South African standards. However, ambient PM levels are in non-compliance, with 60 exceedances of the 24-hour limit value recorded in 2011 and 70 exceedances in 2012, primarily occurring between April and August.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). annexure-h_eskoms-response-to-deas-additonal-information-request-in-terms-of-the-postponement-applications_hendrina-power-station-d57cbbdc7c872fea.pdf. https://cer.org.za/wp-content/uploads/2014/06/Annexure-H_Eskoms-response-to-DEAs-additonal-information-request-in-terms-of-the-postponement-applications_Hendrina-Power-Station.pdf?x21779
- Chicago
- Centre for Environmental Rights. annexure-h_eskoms-response-to-deas-additonal-information-request-in-terms-of-the-postponement-applications_hendrina-power-station-d57cbbdc7c872fea.pdf. n.d. https://cer.org.za/wp-content/uploads/2014/06/Annexure-H_Eskoms-response-to-DEAs-additonal-information-request-in-terms-of-the-postponement-applications_Hendrina-Power-Station.pdf?x21779.
- Wikipedia
- {{cite report |author=Centre for Environmental Rights |title=annexure-h_eskoms-response-to-deas-additonal-information-request-in-terms-of-the-postponement-applications_hendrina-power-station-d57cbbdc7c872fea.pdf |url=https://cer.org.za/wp-content/uploads/2014/06/Annexure-H_Eskoms-response-to-DEAs-additonal-information-request-in-terms-of-the-postponement-applications_Hendrina-Power-Station.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{centreforenvironmentalrightsndannexureheskomsresponsetodeasadditonalinformationrequestintermsofthepostponementapplicationshendrinapowerstationd57cbbdc7c872feapdf, author = {{Centre for Environmental Rights}}, title = {{annexure-h\_eskoms-response-to-deas-additonal-information-request-in-terms-of-the-postponement-applications\_hendrina-power-station-d57cbbdc7c872fea.pdf}}, institution = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2014/06/Annexure-H_Eskoms-response-to-DEAs-additonal-information-request-in-terms-of-the-postponement-applications_Hendrina-Power-Station.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated