Browse all documents

annexure-d_gem09_l019_emission_standards_compliance_timeframes_mar09-1-979b3ed0e8512e11.pdf

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A letter from Eskom to the South African Bureau of Standards (SABS) detailing the company's position on compliance timeframes for proposed Minimum Emission Standards for its coal-fired power stations.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Eskom states that ten of its thirteen operational and return-to-service coal-fired power stations can comply immediately with the proposed particulate matter minimum emission standard of 100 mg/Sm. However, three stations require refurbishments, electrostatic precipitator upgrades, or flue gas conditioning plant installations, meaning it will take 8-10 years for all stations to comply with proposed existing plant standards.
  • Eskom rejects a suggestion from the Department of Environmental Affairs and Tourism that all existing plants should eventually comply with new plant standards, arguing that this is unrealistic and not feasible due to the technology, design, and age of existing power stations.

Cite the original document

APA
Centre for Environmental Rights (n.d.). annexure-d_gem09_l019_emission_standards_compliance_timeframes_mar09-1-979b3ed0e8512e11.pdf. https://cer.org.za/wp-content/uploads/2014/06/Annexure-D_GEM09_L019_emission_standards_compliance_timeframes_Mar09-1.pdf?x21779
Chicago
Centre for Environmental Rights. annexure-d_gem09_l019_emission_standards_compliance_timeframes_mar09-1-979b3ed0e8512e11.pdf. n.d. https://cer.org.za/wp-content/uploads/2014/06/Annexure-D_GEM09_L019_emission_standards_compliance_timeframes_Mar09-1.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=annexure-d_gem09_l019_emission_standards_compliance_timeframes_mar09-1-979b3ed0e8512e11.pdf |url=https://cer.org.za/wp-content/uploads/2014/06/Annexure-D_GEM09_L019_emission_standards_compliance_timeframes_Mar09-1.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrightsndannexuredgem09l019emissionstandardscompliancetimeframesmar091979b3ed0e8512e11pdf, author = {{Centre for Environmental Rights}}, title = {{annexure-d\_gem09\_l019\_emission\_standards\_compliance\_timeframes\_mar09-1-979b3ed0e8512e11.pdf}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2014/06/Annexure-D_GEM09_L019_emission_standards_compliance_timeframes_Mar09-1.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated