A letter from Eskom to the Centre for Environmental Rights detailing the public participation plan and documentation availability regarding an environmental exemption for temporary stacks at the Kusile Power Station.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Eskom scheduled three public hearings regarding the Kusile project: two physical meetings on 12 April in Kendal (south of the station) and eMalahleni (east of the station), and one virtual hearing on 13 April.
  • Eskom decided against holding a public meeting in Phola township due to previous experiences with safety, security issues, and disruptions in that settlement.
  • Documentation for the postponement application is hosted on the website of independent consultants, EIMS, with further detailed information to be distributed formally as it becomes available per legal requirements.

Cite the original document

APA
Centre for Environmental Rights (2023). NOTIFICATION REGARDING ENVIRONMENTAL EXEMPTION FOR THE CONSTRUCTION OF TEMPORARY STACKS AT KUSLIE POWER STATION: REQUEST FOR RELEVANT DOCUMENTS. https://cer.org.za/wp-content/uploads/2023/04/Annexure-3-Eskom-letter-to-CER-6-April-2023.pdf?x21779
Chicago
Centre for Environmental Rights. NOTIFICATION REGARDING ENVIRONMENTAL EXEMPTION FOR THE CONSTRUCTION OF TEMPORARY STACKS AT KUSLIE POWER STATION: REQUEST FOR RELEVANT DOCUMENTS. 2023. https://cer.org.za/wp-content/uploads/2023/04/Annexure-3-Eskom-letter-to-CER-6-April-2023.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=NOTIFICATION REGARDING ENVIRONMENTAL EXEMPTION FOR THE CONSTRUCTION OF TEMPORARY STACKS AT KUSLIE POWER STATION: REQUEST FOR RELEVANT DOCUMENTS |date=4 June 2023 |url=https://cer.org.za/wp-content/uploads/2023/04/Annexure-3-Eskom-letter-to-CER-6-April-2023.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrights2023notification, author = {{Centre for Environmental Rights}}, title = {{NOTIFICATION REGARDING ENVIRONMENTAL EXEMPTION FOR THE CONSTRUCTION OF TEMPORARY STACKS AT KUSLIE POWER STATION: REQUEST FOR RELEVANT DOCUMENTS}}, publisher = {Centre for Environmental Rights}, year = {2023}, month = jun, url = {https://cer.org.za/wp-content/uploads/2023/04/Annexure-3-Eskom-letter-to-CER-6-April-2023.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated