Summary
The document examines the conflict between Tajikistan and Uzbekistan over the proposed Rogun Dam, a massive hydroelectric project intended to solve Tajikistan's energy crisis. While the World Bank is conducting impact assessments, the author argues that the dam poses significant geopolitical risks, including potential armed conflict and economic retaliation from Uzbekistan. The paper suggests that Tajikistan should instead focus on increasing electricity tariffs, privatizing the electrical grid to reduce inefficiencies, and utilizing the CASA-1000 project to export summer energy surpluses.
Key insights
- Tajikistan faces a severe energy crisis characterized by winter shortages and rural consumers receiving only five to seven hours of electricity per day as of late December 2012, exacerbated by the 2009 collapse of the Central Asian electricity grid.
- The proposed Rogun Dam, designed to be 335 meters high with a capacity of 3,600 megawatts, is a source of intense conflict with Uzbekistan, which fears the project will 'strangle' its agricultural sector by depriving it of water during the reservoir's filling period.
- Geopolitical tensions over the dam have manifested as transport blockades, the halting of gas exports from Uzbekistan to Tajikistan, and border clashes, with President Islam Karimov warning that water disputes in Central Asia could lead to war.
- Preliminary World Bank assessments indicate that while the Nurek dam did not affect the Amu Darya's annual water flow, it did regulate seasonal variability, which could negatively impact Uzbekistan's water-intensive irrigation during the April to October growing season.
- The Rogun site has significant seismic risks, with a rating of nine out of twelve on the MSK-64 scale, indicating potential for 'considerable damage to reservoirs' and ground cracks exceeding 10 cm during an earthquake.
- Tajikistan has struggled to finance the estimated $2.2 billion cost of the dam, having abandoned a deal with Russia's RUSAL and a 'People's IPO' that raised only $169 million.
- The author proposes three alternatives to the Rogun Dam: increasing domestic electricity tariffs from 2.25 cents to approximately 4.6 cents per kilowatt hour, privatizing the electrical grid to address the 18 percent transmission loss, and implementing the CASA-1000 project to export summer electricity surpluses to Afghanistan and Pakistan.
Cite the original document
- APA
- Keene, E. (2013). Solving Tajikistan’s Energy Crisis. Carnegie Endowment for International Peace. https://carnegieendowment.org/research/2013/03/solving-tajikistans-energy-crisis
- Chicago
- Keene, Eli. Solving Tajikistan’s Energy Crisis. Carnegie Endowment for International Peace, 2013. https://carnegieendowment.org/research/2013/03/solving-tajikistans-energy-crisis.
- Wikipedia
- {{cite report |last1=Keene |first1=Eli |title=Solving Tajikistan’s Energy Crisis |publisher=Carnegie Endowment for International Peace |date=25 March 2013 |url=https://carnegieendowment.org/research/2013/03/solving-tajikistans-energy-crisis |access-date=5 November 2026 |via=Climate Insights Directory (document carnend-001222)}}
- BibTeX
- @techreport{keene2013solving, author = {Keene, Eli}, title = {{Solving Tajikistan’s Energy Crisis}}, institution = {Carnegie Endowment for International Peace}, year = {2013}, month = mar, url = {https://carnegieendowment.org/research/2013/03/solving-tajikistans-energy-crisis}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document carnend-001222} }
Full text
Collected · Record updated