Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that Dutch dredging companies and the Dutch government prioritised economic competitiveness over human rights, failing to conduct adequate due diligence or mitigate the forced evictions and environmental damage associated with the Suez Canal expansion.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Suez Canal expansion project involved the forced displacement of over 2,000 people, approximately 500 families, who were evicted by the Egyptian Armed Forces and local authorities without prior consent or fair compensation.
  • Dutch dredging companies Boskalis and Van Oord failed to conduct risk-based due diligence or environmental impact assessments prior to the project, and did not meaningfully engage with impacted local stakeholders.
  • The Dutch government, via the Ministry of Finance, explicitly chose to deviate from regular social and environmental due diligence practices to ensure Dutch companies did not suffer competitive disadvantages compared to Belgian competitors.
  • Atradius DSB issued export credit insurance for the project despite its own requirements for a full social and environmental impact assessment not being met, ignoring its promise to provide public information 30 days prior to the decision.
  • The dredging sector faces structural pressures that discourage human rights due diligence, including the need to keep capital-intensive fleets operational and the pressure to complete projects for authoritarian governments within extremely tight deadlines.
  • The expansion of the Suez Canal poses a significant environmental risk to the Mediterranean Sea by increasing the invasion of non-native species from the Red Sea, which can disrupt ecosystems and commercial fishing.
  • The Witteveen+Bos review commissioned by Boskalis and Van Oord was deemed substandard because it was conducted after dredging had already begun and failed to interview affected local stakeholders.

Cite the original document

APA
Hazekamp, N., ten Kate, G., Wiertsema, W., & Wilde-Ramsing, J. (2016). Dredging in the Dark. Both ENDS. https://www.bothends.org/uploaded_files/document/Dredging_in_the_Dark.pdf
Chicago
Hazekamp, Niels, Gisela ten Kate, Wiert Wiertsema, and Joseph Wilde-Ramsing. Dredging in the Dark. Both ENDS, 2016. https://www.bothends.org/uploaded_files/document/Dredging_in_the_Dark.pdf.
Wikipedia
{{cite report |last1=Hazekamp |first1=Niels |last2=ten Kate |first2=Gisela |last3=Wiertsema |first3=Wiert |last4=Wilde-Ramsing |first4=Joseph |title=Dredging in the Dark |publisher=Both ENDS |date=March 2016 |url=https://www.bothends.org/uploaded_files/document/Dredging_in_the_Dark.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document bothends-000520)}}
BibTeX
@techreport{hazekamp2016dredging, author = {Hazekamp, Niels and ten Kate, Gisela and Wiertsema, Wiert and Wilde-Ramsing, Joseph}, title = {{Dredging in the Dark}}, institution = {Both ENDS}, year = {2016}, month = mar, url = {https://www.bothends.org/uploaded_files/document/Dredging_in_the_Dark.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document bothends-000520} }

Full text

Collected · Record updated