Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report argues that Africa's infrastructure push, particularly through public-private partnerships and mega-projects, frequently lacks transparency and human rights safeguards. It concludes that a shift toward decentralized, people-centered, and small-scale infrastructure is necessary to achieve inclusive development and poverty alleviation.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Sub-Saharan Africa faces a significant infrastructure financing gap, with an estimated annual need of USD 93 billion and a current shortfall of USD 45 billion or more.
  • Public-Private Partnerships (PPPs) in Africa are criticized for prioritizing private commercial interests over public needs, lacking transparency, and failing to provide evidence of systemic benefits for the poor.
  • The African Renewable Energy Initiative (AREI) aims to increase renewable capacity to 300 GW by 2030, but civil society warns that the initiative has been 'hijacked' by the EU and France, undermining its principle of being African-led.
  • Large-scale hydropower projects under the Programme for Infrastructure Development in Africa (PIDA) are deemed unsustainable because they ignore climate change risks, such as prolonged droughts that reduce power generation reliability.
  • Large dams in Africa often fail to benefit rural populations, instead serving urban centers and extractive industries; for example, the Inga 3 Dam in the DRC allocates 55% of its capacity for export to South Africa.
  • The Lake Turkana Wind Power Project in Kenya is highlighted as a 'cautionary tale' where land was leased without public consultation or compensation for pastoralist communities.
  • In South Africa, the Renewable Energy Independent Power Producer Procurement Programme (REI4P) is cited as a success in attracting private investment, yet its progress is hindered by Eskom's preference for high-cost nuclear power and coal.
  • Nigeria's Cross River State Superhighway project is criticized for its lack of transparency, high cost (USD 3.5 billion), and potential to act as a 'logging scheme' rather than a development tool.
  • Inclusive development in Nigeria would be better served by 'small infrastructure'—such as solar power and rural roads in agricultural clusters—rather than mega-projects.

Cite the original document

APA
Heinrich Böll Stiftung Southern Africa (2017). AFRICA Putting People Back Into Infrastructure. https://za.boell.org/sites/default/files/perspectives_june17_web.pdf
Chicago
Heinrich Böll Stiftung Southern Africa. AFRICA Putting People Back Into Infrastructure. 2017. https://za.boell.org/sites/default/files/perspectives_june17_web.pdf.
Wikipedia
{{cite report |author=Heinrich Böll Stiftung Southern Africa |title=AFRICA Putting People Back Into Infrastructure |date=June 2017 |url=https://za.boell.org/sites/default/files/perspectives_june17_web.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document boellza-000153)}}
BibTeX
@techreport{heinrichbllstiftungsouthernafrica2017africa, author = {{Heinrich Böll Stiftung Southern Africa}}, title = {{AFRICA Putting People Back Into Infrastructure}}, institution = {Heinrich Böll Stiftung Southern Africa}, year = {2017}, month = jun, url = {https://za.boell.org/sites/default/files/perspectives_june17_web.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document boellza-000153} }

Full text

Collected · Record updated