ASEC reviews Ghana's 2026 Mid-Year Budget Review, supporting efforts to increase energy security through a 1,200 MW thermal plant and a second Gas Processing Plant, but warns that these investments risk undermining the country's 10% renewable energy target for 2030. The organization criticizes the lack of budget allocation for low-carbon technologies despite the renaming of the Ministry of Energy and Green Transition, and expresses disappointment over the retention of the GHS 1 fuel levy. ASEC also advocates for a broader clean cooking strategy beyond LPG and calls for more stakeholder engagement regarding the shift to a private sector-led model for the second Gas Processing Plant.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The proposed 1,200 MW thermal power plant supports energy security and industrialization, but ASEC warns it may hinder Ghana's goal of a 10% renewable energy share by 2030, as renewables currently only provide about 2% of electricity generation.
  • Despite the renaming of the Ministry of Energy and Green Transition, ASEC finds that the Mid-Year Budget Review lacks sufficient investment in green transition initiatives such as battery storage, energy efficiency, green hydrogen, and electric mobility.
  • ASEC opposes the retention of the GHS 1 fuel levy, stating it increases financial burdens on households and businesses; the organization requests transparency on the use of these funds and a roadmap for the levy's removal.
  • While the expansion of Liquefied Petroleum Gas (LPG) is viewed as a positive transitional step for public health, ASEC argues Ghana needs a comprehensive clean cooking strategy that includes electric cooking, bioethanol, biogas, and improved biomass cookstoves.
  • The construction of a second Gas Processing Plant (GPP Train 2) is supported for its role in energy security, but ASEC criticizes the shift to a private sector-led arrangement without sufficient stakeholder engagement and urges a review of fiscal terms and local content requirements.

Cite the original document

APA
Afful, E. (2026). ASEC'S TAKE ON THE 2026 MID-YEAR BUDGET REVIEW: GHANA MUST BALANCE ENERGY SECURITY WITH THE GREEN TRANSITION. Africa Sustainable Energy Centre. https://www.asecafrica.org/asecgha/asecs-take-on-the-2026-mid-year-budget-review-ghana-must-balance-energy-security-with-the-green-transition
Chicago
Afful, Elvis. ASEC'S TAKE ON THE 2026 MID-YEAR BUDGET REVIEW: GHANA MUST BALANCE ENERGY SECURITY WITH THE GREEN TRANSITION. Africa Sustainable Energy Centre, 2026. https://www.asecafrica.org/asecgha/asecs-take-on-the-2026-mid-year-budget-review-ghana-must-balance-energy-security-with-the-green-transition.
Wikipedia
{{cite press release |last1=Afful |first1=Elvis |title=ASEC'S TAKE ON THE 2026 MID-YEAR BUDGET REVIEW: GHANA MUST BALANCE ENERGY SECURITY WITH THE GREEN TRANSITION |publisher=Africa Sustainable Energy Centre |date=25 July 2026 |url=https://www.asecafrica.org/asecgha/asecs-take-on-the-2026-mid-year-budget-review-ghana-must-balance-energy-security-with-the-green-transition |access-date=5 November 2026 |via=Climate Insights Directory (document asecaf-000002)}}
BibTeX
@misc{afful2026asecs, author = {Afful, Elvis}, title = {{ASEC'S TAKE ON THE 2026 MID-YEAR BUDGET REVIEW: GHANA MUST BALANCE ENERGY SECURITY WITH THE GREEN TRANSITION}}, publisher = {Africa Sustainable Energy Centre}, year = {2026}, month = jul, url = {https://www.asecafrica.org/asecgha/asecs-take-on-the-2026-mid-year-budget-review-ghana-must-balance-energy-security-with-the-green-transition}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document asecaf-000002} }

Full text

Collected · Record updated