The Bermuda Connection: Profit shifting, inequality and unaffordability at Lonmin 1999-2012
Summary
The report argues that Lonmin's claim of unaffordability regarding the 2012 rock drill operator (RDO) wage demands was a choice rather than a financial necessity. By analyzing financial statements, the author identifies significant profit shifting via sales commissions to Western Metal Sales Limited (WMSL) in Bermuda and management fees to Lonmin Management Services (LMS) in South Africa. The report estimates that terminating these arrangements and reducing excessive management fees could have provided sufficient funds to meet the R12,500 basic wage demand and fulfill Social Labour Plan (SLP) housing commitments. Additionally, the document highlights extreme income inequality within the company, noting a vast gap between the lowest-paid workers and a small elite of directors and managers, while criticizing the Department of Labour for failing to monitor vertical income disparities under the Employment Equity Act.
Key insights
- Lonmin's rock drill operator (RDO) wages were not competitive with those of Anglo Platinum (Amplats) and Impala Platinum (Implats) prior to August 2012, a fact acknowledged by Lonmin's own managers in July 2012.
- Lonmin utilized a profit-shifting arrangement where Western Platinum Limited (WPL) paid sales commissions to Western Metal Sales Limited (WMSL), a 100% owned subsidiary in the tax haven of Bermuda.
- The report identifies a 'double accounting' error or anomaly where sales commissions and management fees paid by WPL from 2006 onwards were higher than the stipulated 2% and 1.9% of revenue, resulting in an overpayment of R161 million in commissions and R157 million in fees between 2007 and 2011.
- Lonmin Management Services (LMS), the South African branch of Lonmin Plc, received management fees from local subsidiaries and subsequently paid 'management fees' of R429 million to Lonmin Plc in the UK between 2007 and 2010.
- The report concludes that the RDO demand for a basic wage of R12,500 after tax was affordable if the Bermuda profit-shifting arrangement was terminated and LMS fees were reduced to a reasonable amount.
- Lonmin neglected its Social Labour Plan (SLP) commitments, specifically the obligation to build 5,500 houses, despite having the financial capacity to do so if profit shifting had been curtailed.
- The South African Department of Labour (DOL) is accused of breaching Section 27 of the Employment Equity Act (EEA) by failing to monitor vertical income disparities between different wage bands, focusing instead only on horizontal equity within the same bands.
- Contract workers at Lonmin experienced significant real wage losses between 2009 and 2013, with average earnings remaining nominally stagnant at R7,535 per month while the CPI Headline index increased by 22%.
- WPL engaged in tax planning by declaring inter-company loans to Messina Ltd as 'impaired' between 2008 and 2012, thereby reducing its taxable profit in South Africa.
Cite the original document
- APA
- Forslund, D. (n.d.). The Bermuda Connection: Profit shifting, inequality and unaffordability at Lonmin 1999-2012. Alternative Information & Development Centre. https://aidc.org.za/download/BermudaLonmin04low.pdf
- Chicago
- Forslund, Dick. The Bermuda Connection: Profit shifting, inequality and unaffordability at Lonmin 1999-2012. Alternative Information & Development Centre, n.d. https://aidc.org.za/download/BermudaLonmin04low.pdf.
- Wikipedia
- {{cite report |last1=Forslund |first1=Dick |title=The Bermuda Connection: Profit shifting, inequality and unaffordability at Lonmin 1999-2012 |publisher=Alternative Information & Development Centre |url=https://aidc.org.za/download/BermudaLonmin04low.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document aidcza-000118)}}
- BibTeX
- @techreport{forslundndbermuda, author = {Forslund, Dick}, title = {{The Bermuda Connection: Profit shifting, inequality and unaffordability at Lonmin 1999-2012}}, institution = {Alternative Information \& Development Centre}, url = {https://aidc.org.za/download/BermudaLonmin04low.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document aidcza-000118} }
Full text
Collected · Record updated