Les Guinéens sont de plus en plus insatisfaits de la fourniture fiable en électricité
Summary
The document reports that while public electricity network coverage in Guinea increased to 42% of enumeration areas by 2024, only 32% of households are actually connected. Among those connected, only 23% report reliable power, leading 30% of the population to seek alternative energy sources, primarily solar panels. Consequently, 85% of citizens disapprove of the government's performance in providing reliable electricity, ranking it as the fourth most pressing national problem.
Key insights
- Public electricity network coverage has improved, with 42% of enumeration areas (ZD) having access to a network in 2024, up from 32% in 2017. This coverage is highly uneven, reaching 100% of ZDs in Conakry and 97% in urban areas, compared to only 12% in rural areas and 21-22% in the Mamou and Faranah regions.
- Despite network availability in some areas, actual household connection remains low at 32%. Connection rates vary sharply between urban areas (76%) and rural areas (7%), with Conakry showing a connection rate of 68%.
- Reliability of the public grid is poor; only 23% of connected households report that electricity is available 'most of the time' or 'all the time'. In contrast, 46% of connected users state power is available only 'sometimes' or 'never'. Conakry, despite high coverage, has low reliability, with only 13% of connected residents reporting reliable electricity.
- Due to grid failures, 30% of Guineans use alternative energy sources. Solar panels are the dominant alternative, used by 74% of those seeking non-grid power, followed by generators (10%), batteries (8%), and hydroelectricity (5%).
- Public dissatisfaction with energy provision is high and growing. Electricity is ranked as the fourth most important problem the government should address, and 85% of respondents disapprove of the government's performance in providing reliable electricity, a 19 percentage point increase since 2022.
- Guinea possesses significant hydroelectric potential, estimated at 6,000 MW and 19,300 GWh per year. To leverage this, the government has implemented projects including the Kaléta (240 MW) and Souapiti (450 MW) dams, an interconnection project with Mali, and the Projet d’Amélioration de l’Accès à l’Electricité en Guinée (PAAEG) aimed at extending access to 1.53 million people.
Cite the original document
- APA
- Sylla, M. (2025). Les Guinéens sont de plus en plus insatisfaits de la fourniture fiable en électricité. Afrobarometer. https://www.afrobarometer.org/wp-content/uploads/2025/12/AD1096-Guineens-sont-de-plus-en-plus-insatisfaits-de-la-fourniture-en-electricite_Afrobarometer-19dec25.pdf
- Chicago
- Sylla, Mohamed. Les Guinéens sont de plus en plus insatisfaits de la fourniture fiable en électricité. Afrobarometer, 2025. https://www.afrobarometer.org/wp-content/uploads/2025/12/AD1096-Guineens-sont-de-plus-en-plus-insatisfaits-de-la-fourniture-en-electricite_Afrobarometer-19dec25.pdf.
- Wikipedia
- {{cite report |last1=Sylla |first1=Mohamed |title=Les Guinéens sont de plus en plus insatisfaits de la fourniture fiable en électricité |publisher=Afrobarometer |date=22 December 2025 |url=https://www.afrobarometer.org/wp-content/uploads/2025/12/AD1096-Guineens-sont-de-plus-en-plus-insatisfaits-de-la-fourniture-en-electricite_Afrobarometer-19dec25.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afbarom-000170)}}
- BibTeX
- @techreport{sylla2025les, author = {Sylla, Mohamed}, title = {{Les Guinéens sont de plus en plus insatisfaits de la fourniture fiable en électricité}}, institution = {Afrobarometer}, year = {2025}, month = dec, url = {https://www.afrobarometer.org/wp-content/uploads/2025/12/AD1096-Guineens-sont-de-plus-en-plus-insatisfaits-de-la-fourniture-en-electricite_Afrobarometer-19dec25.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afbarom-000170} }
Full text
Collected · Record updated