VALUE FOR MONEY (VFM) ANALYSIS OF OIL-FUNDED IRRIGATION PROJECTS IN GHANA: THE CASE OF KEYIME AND OHAWU IRRIGATION PROJECTS IN THE VOLTA REGION OF GHANA
Summary
The report finds that the Keyime and Ohawu irrigation projects suffered significant cost and time overruns and reduced operational scope due to untimely disbursement of petroleum funds, despite providing some local employment and domestic water benefits.
Key insights
- The Keyime and Ohawu irrigation projects experienced significant cost overruns; by March 2016, price fluctuations led to an overrun of GH¢1,831,110.80, and the Ohawu project required an additional estimated GH¢3,112,200.00 due to undetected seepages in the dam walls.
- Due to funding challenges, the scope of both projects was drastically reduced: the Keyime dam's irrigable land was curtailed from an original 200 hectares to 27 hectares, and the Ohawu dam's capacity was reduced from 150 hectares to 10 hectares.
- There is a critical lack of transparency regarding the funding source; neither the contractor, GIDA staff, nor community leaders were aware that the projects were funded by the Annual Budgeting Funding Amount (ABFA) from petroleum receipts.
- The projects suffered from untimely fund disbursements, leading to time overruns; the Keyime project faced a 4-month delay (estimated completion June 2016), while the Ohawu project was suspended indefinitely in June 2015 due to leakages and lack of funds to fix them.
- Socially, the projects provided local employment, including over 300 laborers for the Keyime dam and 210 women specifically employed for water carrying, which improved local income levels and allowed for investment in farming businesses.
- The dams provided immediate domestic benefits by addressing water accessibility for cooking, washing, bathing, and drinking, and improved school punctuality for students in the Adzonkor community who previously walked miles for water.
Cite the original document
- APA
- Africa Centre for Energy Policy (n.d.). VALUE FOR MONEY (VFM) ANALYSIS OF OIL-FUNDED IRRIGATION PROJECTS IN GHANA: THE CASE OF KEYIME AND OHAWU IRRIGATION PROJECTS IN THE VOLTA REGION OF GHANA. https://acep.africa/wp-content/uploads/2023/03/VFmreportKEYMEANDOHAWU.pdf
- Chicago
- Africa Centre for Energy Policy. VALUE FOR MONEY (VFM) ANALYSIS OF OIL-FUNDED IRRIGATION PROJECTS IN GHANA: THE CASE OF KEYIME AND OHAWU IRRIGATION PROJECTS IN THE VOLTA REGION OF GHANA. n.d. https://acep.africa/wp-content/uploads/2023/03/VFmreportKEYMEANDOHAWU.pdf.
- Wikipedia
- {{cite report |author=Africa Centre for Energy Policy |title=VALUE FOR MONEY (VFM) ANALYSIS OF OIL-FUNDED IRRIGATION PROJECTS IN GHANA: THE CASE OF KEYIME AND OHAWU IRRIGATION PROJECTS IN THE VOLTA REGION OF GHANA |url=https://acep.africa/wp-content/uploads/2023/03/VFmreportKEYMEANDOHAWU.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document acep-000180)}}
- BibTeX
- @techreport{africacentreforenergypolicyndvalue, author = {{Africa Centre for Energy Policy}}, title = {{VALUE FOR MONEY (VFM) ANALYSIS OF OIL-FUNDED IRRIGATION PROJECTS IN GHANA: THE CASE OF KEYIME AND OHAWU IRRIGATION PROJECTS IN THE VOLTA REGION OF GHANA}}, institution = {Africa Centre for Energy Policy}, url = {https://acep.africa/wp-content/uploads/2023/03/VFmreportKEYMEANDOHAWU.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document acep-000180} }
Full text
Collected · Record updated