Summary
The ACEP Radar identifies significant governance failures in Ghana's energy sector, most notably estimating a GHS 1.5 billion revenue loss in 2017 due to fuel smuggling.
Key insights
- The privatization process for the Electricity Company of Ghana (ECG) lacked transparency, with four of six shortlisted applicants dropping out and the eventual winner, Meralco, not disclosing its required 51% local partner.
- Ghana's LNG deal with Rosneft follows a previous contract with Gazprom that ACEP argues failed to account for global LNG price dynamics, potentially costing citizens more through tariffs or GNPC cash flow risks.
- The Ministry of Finance failed to account for GHC 400.9 million (54.6% of total disbursed funds) of the Annual Budget Funding Amount (ABFA) that remained unutilized in 2017.
Cite the original document
- APA
- Africa Centre for Energy Policy (2018). THE ACEP RADAR. https://acep.africa/wp-content/uploads/2023/03/2018-06-ACEPRADAR.pdf
- Chicago
- Africa Centre for Energy Policy. THE ACEP RADAR. 2018. https://acep.africa/wp-content/uploads/2023/03/2018-06-ACEPRADAR.pdf.
- Wikipedia
- {{cite report |author=Africa Centre for Energy Policy |title=THE ACEP RADAR |date=2018 |url=https://acep.africa/wp-content/uploads/2023/03/2018-06-ACEPRADAR.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document acep-000035)}}
- BibTeX
- @techreport{africacentreforenergypolicy2018acep, author = {{Africa Centre for Energy Policy}}, title = {{THE ACEP RADAR}}, institution = {Africa Centre for Energy Policy}, year = {2018}, url = {https://acep.africa/wp-content/uploads/2023/03/2018-06-ACEPRADAR.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document acep-000035} }
Full text
Collected · Record updated