The report finds that while a copper smelting project is financially feasible, it would yield a lower net present value (106.7 million USD) than continuing to export copper concentrate (152.3 million USD) under current assumptions.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Continuing to export copper concentrate is more financially rewarding than building a smelting complex, with a net present value (NPV) of 152.3 million USD compared to 106.7 million USD for the integrated complex.
  • A standalone smelting plant operating on a third-party processing fee basis is not commercially viable, with projected operating costs of 9.0 billion USD and investment costs of 2.4 billion USD against revenues of approximately 3.4 billion USD.
  • The project's financial performance is most sensitive to the price of copper, which shows a strong positive Pearson correlation of 87.2 with the project's NPV.
  • Sulfur dioxide (SO2) emissions represent the primary environmental challenge; modern standards require capturing over 99% of these emissions and converting them into sulfuric acid.
  • The ability to sell sulfuric acid significantly impacts the project's returns, although even selling 100% of produced acid does not make the integrated complex more profitable than the concentrate-export scenario.
  • There is a lack of transparency regarding the project's technical and economic justifications, as full Environmental and Social Impact Assessment (ESIA) reports and detailed investment assumptions have not been made public.
  • The government's current tax policy, specifically the high reliance on royalties (AMNAT), may reduce the project's overall profitability and the resulting corporate income tax and dividend payments.
  • The SKS smelting technology selected by the government is among the mid-range for global average cash costs, at approximately 493 USD per tonne of copper.

Cite the original document

APA
Н.ДОРЖДАРЬ, & Н.ЗОЛЖАРГАЛ (2026). Нэмүү өртгийн эрэлд: Эрдэнэтэд зэс хайлуулах төслийн төсөв санхүү, байгаль орчны үр нөлөөг үнэлэх нь. Natural Resource Governance Institute. https://resourcegovernance.org/sites/default/files/2026-10/nrgi-erdenet-smelter-report-mn.pdf
Chicago
Н.ДОРЖДАРЬ, and Н.ЗОЛЖАРГАЛ. Нэмүү өртгийн эрэлд: Эрдэнэтэд зэс хайлуулах төслийн төсөв санхүү, байгаль орчны үр нөлөөг үнэлэх нь. Natural Resource Governance Institute, 2026. https://resourcegovernance.org/sites/default/files/2026-10/nrgi-erdenet-smelter-report-mn.pdf.
Wikipedia
{{cite report |last1=Н.ДОРЖДАРЬ |last2=Н.ЗОЛЖАРГАЛ |title=Нэмүү өртгийн эрэлд: Эрдэнэтэд зэс хайлуулах төслийн төсөв санхүү, байгаль орчны үр нөлөөг үнэлэх нь |publisher=Natural Resource Governance Institute |date=September 2026 |url=https://resourcegovernance.org/sites/default/files/2026-10/nrgi-erdenet-smelter-report-mn.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document NRGI-000571)}}
BibTeX
@techreport{2026, author = {Н.ДОРЖДАРЬ and Н.ЗОЛЖАРГАЛ}, title = {{Нэмүү өртгийн эрэлд: Эрдэнэтэд зэс хайлуулах төслийн төсөв санхүү, байгаль орчны үр нөлөөг үнэлэх нь}}, institution = {Natural Resource Governance Institute}, year = {2026}, month = sep, url = {https://resourcegovernance.org/sites/default/files/2026-10/nrgi-erdenet-smelter-report-mn.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document NRGI-000571} }

Full text

Collected · Record updated