The document examines a US $283.5 million partnership between Katanga Mining and the public utility SNEL to upgrade energy infrastructure in the DRC, finding that while such synergies can unlock investment, they are hindered by severe governance risks and regulatory instability.
Key insights
- In 2012, Katanga Mining signed a loan agreement with the national utility Société Nationale d’Electricité (SNEL) for US $283.5 million to upgrade electricity generation capacity at Inga 2 and the transmission network.
- The investment is structured so that SNEL reimburses the loan through utility bill credits; US $189 million will be paid back via Katanga Mining's subsidiaries operating the Kansuki and Mutanda mines.
- Power shortages in the Katanga region caused significant economic losses in 2012, including US $1.8 billion in lost exports, US $700 million in lost GDP (4.4 percent of GDP), and US $250 million in lost tax revenues (1.6 percent of GDP).
- The partnership faces substantial governance and implementation risks, including a lack of transparency in energy supply agreements, allegations of corruption, and an uncertain regulatory environment.
- The financial solvency of SNEL is compromised because it has historically subsidized the mining sector with tariffs set below cost-recovery levels (around 3.5 c/kWh), which undermines its ability to maintain the power system.
- The DRC government, with World Bank assistance, is implementing a 2012-2017 reform process to liberalize the electricity sector, which includes the privatization of the high-tension electricity network in Katanga province.
Cite the original document
- APA
- Maennling, N., Toledano, P., & Thomashausen, S. (2016). Mine Power: Partnering to Upgrade Energy Infrastructure in the DRC. Natural Resource Governance Institute. https://resourcegovernance.org/sites/default/files/documents/mine-power-partnering-to-upgrade-energy-infrastructure-in-the-drc.pdf
- Chicago
- Maennling, Nicolas, Perrine Toledano, and Sophie Thomashausen. Mine Power: Partnering to Upgrade Energy Infrastructure in the DRC. Natural Resource Governance Institute, 2016. https://resourcegovernance.org/sites/default/files/documents/mine-power-partnering-to-upgrade-energy-infrastructure-in-the-drc.pdf.
- Wikipedia
- {{cite report |last1=Maennling |first1=Nicolas |last2=Toledano |first2=Perrine |last3=Thomashausen |first3=Sophie |title=Mine Power: Partnering to Upgrade Energy Infrastructure in the DRC |publisher=Natural Resource Governance Institute |date=March 2016 |url=https://resourcegovernance.org/sites/default/files/documents/mine-power-partnering-to-upgrade-energy-infrastructure-in-the-drc.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document NRGI-000527)}}
- BibTeX
- @techreport{maennling2016mine, author = {Maennling, Nicolas and Toledano, Perrine and Thomashausen, Sophie}, title = {{Mine Power: Partnering to Upgrade Energy Infrastructure in the DRC}}, institution = {Natural Resource Governance Institute}, year = {2016}, month = mar, url = {https://resourcegovernance.org/sites/default/files/documents/mine-power-partnering-to-upgrade-energy-infrastructure-in-the-drc.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document NRGI-000527} }
Full text
Collected · Record updated