Search Climate Insights Directory
1 result
DateDocumentOrganization and type
Geothermal Energy and Efficiency Upgrades Give New Life to an Old Illinois Church
This case study details the transition of the Euclid Avenue United Methodist Church in Oak Park, Illinois, toward net-zero energy through a series of phased upgrades. Starting in 2011, the church replaced an inefficient gas boiler with a geothermal heat pump system, followed by the installation of rooftop solar panels in 2014, LED lighting upgrades in 2020, and a subscription to a community solar farm in 2021.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Case study
Showing 1–1 of 1 document