Search Climate Insights Directory

Search syntax
intitle:
The document title intitle:"climate education"
ispublisher:
The publishing organization ispublisher:CAPE
insummary:
Summary and key findings insummary:"conflict of interest"
hasconcept:
Climate tags, frame/perspective and analysis type hasconcept:"Climate Justice"
geography:
Regions the document covers or discusses geography:Canada
doctype:
Document type doctype:report
lang:
Document language, as an ISO code lang:fr
cidid:
One record, by its directory id cidid:iisd-000297
Analysis TypeSystem modelling
Clear all

1 result

  • The report argues that Eskom is facing a liquidity and financial crisis driven by stagnant electricity demand and the high costs of its coal-fired power construction programme. Through system-level modelling and station-specific analysis, the study finds that the levelised costs of operating older coal stations (Arnot, Camden, Grootvlei, Hendrina, and Komati) exceed their system alternative value, meaning they can be replaced by cheaper alternatives without compromising security of supply. Specifically, decommissioning Grootvlei, Hendrina, and Komati early could save Eskom R12.5bn in present value terms. Additionally, the report finds that cancelling Kusile units 5 and 6 is economically viable if capital cost savings exceed a threshold of approximately R4.7bn. The authors conclude that South Africa no longer requires new nuclear, coal, or gas procurement, as solar PV and wind have become the most competitive new-build options.

    AI-generated

    This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

    Document type: Report

    Regions: South Africa
Showing 1–1 of 1 document