Search Climate Insights Directory

Search syntax
intitle:
The document title intitle:"climate education"
ispublisher:
The publishing organization ispublisher:CAPE
insummary:
Summary and key findings insummary:"conflict of interest"
hasconcept:
Climate tags, frame/perspective and analysis type hasconcept:"Climate Justice"
geography:
Regions the document covers or discusses geography:Canada
doctype:
Document type doctype:report
lang:
Document language, as an ISO code lang:fr
cidid:
One record, by its directory id cidid:iisd-000297
Analysis TypeEnvironmental review
Clear all

2 results

  • The Department of Forestry, Fisheries and the Environment (DFFE) of South Africa has refused an application for Environmental Authorisation submitted by Karpowership SA (Pty) Ltd for a 540MW Gas to Power Powership Project at the Port of Richards Bay. The refusal is based on significant failures in the Environmental Impact Assessment (EIA) process, including inadequate public participation, contradictory specialist reports, and critical gaps in assessing impacts on marine and avian biodiversity.

    AI-generated

    This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

    Document type: Statement

  • The assessment concludes that the Yzermyn underground coal mine is 'fatally flawed' from a biodiversity perspective and recommends a 'NO GO' decision. The project is located in a highly sensitive area, including the Enkangala Grassland Important Bird Area (IBA) and several Freshwater Ecosystem Priority Areas (FEPAs). Key risks include the potential for extensive wetland loss or deterioration due to groundwater drawdown (cones of depression) and long-term groundwater contamination from acid mine drainage (AMD) post-closure. The report highlights a significant disconnect between the findings of independent specialists—who identify high-significance impacts and irreplaceable habitats—and the Environmental Impact Assessment Report (EIAR), which downplays these risks by focusing narrowly on the surface infrastructure footprint. The assessment notes that the project threatens numerous 'Conservation Important' (CI) species of birds, mammals, reptiles, and amphibians.

    AI-generated

    This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

    Document type: Report

    Regions: Mpumalanga
Showing 1–2 of 2 documents