The Role of Public Finance in CSP: Case Study Eskom CSP South Africa
Summary
The case study finds that public finance is essential to bridge the viability gap for CSP power towers, as seen in the technically ambitious 100 MW Eskom project in South Africa.
Key insights
- The Eskom CSP project in South Africa is among the most ambitious and technically challenging CSP developments outside the US, specifically regarding its use of power tower technology, its 100 MW generating capacity, and its 9-12 hours of storage.
- Eskom utilized political support and concessional lending from international financial institutions for development, though the resulting foreign debt introduced additional risks for the utility.
- Public sources of finance are necessary to bridge the viability gap between CSP power towers and cheaper alternative energy options.
Cite the original document
- APA
- User, S. (2021). The Role of Public Finance in CSP: Case Study Eskom CSP South Africa. Trade and Industrial Policy Strategies. https://tips.org.za/just-transition/item/4057-the-role-of-public-finance-in-csp-case-study-eskom-csp-south-africa
- Chicago
- User, Super. The Role of Public Finance in CSP: Case Study Eskom CSP South Africa. Trade and Industrial Policy Strategies, 2021. https://tips.org.za/just-transition/item/4057-the-role-of-public-finance-in-csp-case-study-eskom-csp-south-africa.
- Wikipedia
- {{cite report |last1=User |first1=Super |title=The Role of Public Finance in CSP: Case Study Eskom CSP South Africa |publisher=Trade and Industrial Policy Strategies |date=6 May 2021 |url=https://tips.org.za/just-transition/item/4057-the-role-of-public-finance-in-csp-case-study-eskom-csp-south-africa |access-date=5 November 2026 |via=Climate Insights Directory (document tipsza-000117)}}
- BibTeX
- @techreport{user2021role, author = {User, Super}, title = {{The Role of Public Finance in CSP: Case Study Eskom CSP South Africa}}, institution = {Trade and Industrial Policy Strategies}, year = {2021}, month = may, url = {https://tips.org.za/just-transition/item/4057-the-role-of-public-finance-in-csp-case-study-eskom-csp-south-africa}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document tipsza-000117} }
Full text
Collected · Record updated