Summary
The 'Power Hour' project improved transparency and trust in Nigeria's electricity sector, contributing to the metering of tens of thousands of customers in Edo, Delta, and Rivers States.
Key insights
- The project's radio programming reached 3,550,000 people across Delta, Edo, and Rivers States, informing the public about the meter roll-out strategies of the Port Harcourt Electricity Distribution Company (PHED) and Benin Electricity Distribution Company (BEDC).
- By the second quarter of 2021, BEDC had metered 20,497 customers in Edo State and 11,123 in Delta State, while PHED metered approximately 56,000 customers.
- The project led BEDC to establish anonymous complaint mechanisms for corruption and implement the Meter Asset Provider policy and customer enumeration to combat estimated billing and electricity theft.
- Nigeria's electricity infrastructure faced a significant shortage in 2017, with an installed capacity of approximately 6,803 megawatts against a forecasted need of 30,000 megawatts by 2020.
Cite the original document
- APA
- Stakeholder Democracy Network (2019). Power Hour. https://sdn.ngo/powerhour/
- Chicago
- Stakeholder Democracy Network. Power Hour. 2019. https://sdn.ngo/powerhour/.
- Wikipedia
- {{cite report |author=Stakeholder Democracy Network |title=Power Hour |date=1 October 2019 |url=https://sdn.ngo/powerhour/ |access-date=5 November 2026 |via=Climate Insights Directory (document sdn-000056)}}
- BibTeX
- @techreport{stakeholderdemocracynetwork2019power, author = {{Stakeholder Democracy Network}}, title = {{Power Hour}}, institution = {Stakeholder Democracy Network}, year = {2019}, month = oct, url = {https://sdn.ngo/powerhour/}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document sdn-000056} }
Full text
Collected · Record updated