A case study on a peak shaving project in New Delhi, India, featuring a 100 kWp ground-mounted PV plant and 466 kWh of Cegasa lithium LFP battery storage to address India's record-high peak electricity demand.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • A peak shaving project was implemented at the 'Shivalik Grid' premises of BSES Rajdhani Power Limited (BPRL) in New Delhi, built by RAACH SOLAR for GIZ India. The installation consists of a 100 kWp ground-mounted photovoltaic solar power plant paired with Cegasa lithium LFP batteries providing 466 kWh (48 Vdc) of storage capacity and 27 SMA Sunny Island 8.0H inverters.
  • The project addresses the issue of peak power demand in India, which reached a record high of 200,57 GW as of July 7, 2021, according to Mr. Raj Kumar Singh of the Union Power Ministry.
  • Cegasa, founded in 1934, manufactures industrial and lithium-ion batteries and energy storage solutions entirely in Europe, specializing in applications including off-grid installations, microgrids, peak shaving, and electric vehicle recharge.

Cite the original document

APA
Alliance for Renewable Electrification (1970). Cegasa – Energy Storage System for Peak Shaving Application Project at New Delhi (India). https://renewelec.org/case-study/energy-storage-system-peak-shaving-application-project-new-delhi-india-1/
Chicago
Alliance for Renewable Electrification. Cegasa – Energy Storage System for Peak Shaving Application Project at New Delhi (India). 1970. https://renewelec.org/case-study/energy-storage-system-peak-shaving-application-project-new-delhi-india-1/.
Wikipedia
{{cite report |author=Alliance for Renewable Electrification |title=Cegasa – Energy Storage System for Peak Shaving Application Project at New Delhi (India) |date=1 January 1970 |url=https://renewelec.org/case-study/energy-storage-system-peak-shaving-application-project-new-delhi-india-1/ |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{allianceforrenewableelectrification1970cegasa, author = {{Alliance for Renewable Electrification}}, title = {{Cegasa – Energy Storage System for Peak Shaving Application Project at New Delhi (India)}}, institution = {Alliance for Renewable Electrification}, year = {1970}, month = jan, url = {https://renewelec.org/case-study/energy-storage-system-peak-shaving-application-project-new-delhi-india-1/}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated