A 450 kWp roof-mounted PV solar power plant with a 484 kWh Cegasa lithium LFP battery storage system was installed at the Benin – Niger border post in Malenville, Benin. The project, built for UEMOA by SAGEMCOM Energy & Telecom, Sahel Energie Solaire, and AEP, aims to provide reliable self-consumption power to Juxtaposed Control Stations in an area with an underdeveloped electrical grid.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • A mini hybrid photovoltaic solar power plant was constructed in Malenville, Benin, to power the Juxtaposed Control Stations of the Benin – Niger border post. The system features 450 kWp of roof-installed PV power and a Cegasa lithium LFP battery backup system providing 484 kWh (672 Vdc) of storage capacity to ensure a guaranteed power supply for self-consumption.
  • The project was implemented in Malenville, Benin, a location on the border with Niger characterized by a very underdeveloped grid with numerous problems.
  • The project involved several entities: Cegasa provided the High Energy Storage solution, while the plant was built by SAGEMCOM Energy & Telecom, Sahel Energie Solaire, and AEP for the West African Economic and Monetary Union (UEMOA).

Cite the original document

APA
Alliance for Renewable Electrification (2021). Cegasa – High Energy Storage System for a Mini Hybrid PV Solar Power Plant (Benin). https://renewelec.org/case-study/cegasa-high-energy-storage-system-mini-hybrid-pv-solar-power-plant-benin/
Chicago
Alliance for Renewable Electrification. Cegasa – High Energy Storage System for a Mini Hybrid PV Solar Power Plant (Benin). 2021. https://renewelec.org/case-study/cegasa-high-energy-storage-system-mini-hybrid-pv-solar-power-plant-benin/.
Wikipedia
{{cite report |author=Alliance for Renewable Electrification |title=Cegasa – High Energy Storage System for a Mini Hybrid PV Solar Power Plant (Benin) |date=15 March 2021 |url=https://renewelec.org/case-study/cegasa-high-energy-storage-system-mini-hybrid-pv-solar-power-plant-benin/ |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{allianceforrenewableelectrification2021cegasa, author = {{Alliance for Renewable Electrification}}, title = {{Cegasa – High Energy Storage System for a Mini Hybrid PV Solar Power Plant (Benin)}}, institution = {Alliance for Renewable Electrification}, year = {2021}, month = mar, url = {https://renewelec.org/case-study/cegasa-high-energy-storage-system-mini-hybrid-pv-solar-power-plant-benin/}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated