Browse all documents

Montserrat — Halfway on the Road to 100 Percent Renewables

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A case study detailing RMI's assistance to the Government of Montserrat and its utility company in installing a 750 kW solar system and 1 MWh battery storage, which brought the island to 50 percent renewable energy installed capacity.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The installation of a 750 kW ground mount solar system and 1 MWh of battery energy storage, which powers 300 households, has enabled Montserrat to reach 50 percent renewable energy in terms of installed capacity. This supports the island's broader goal of achieving 100 percent renewable electricity generation by 2030.
  • The project generated local economic and educational benefits, employing 70 local employees across 11 entities. It also increased public interest in solar energy, with a notable 80 percent of students on an organized tour of the facility being girls.
  • To ensure resilience against local environmental factors, the project's technical specifications required compliance with international best practices and regional risks, including designing for 180 mph wind speeds and Exposure Category C for hurricanes.

Cite the original document

APA
RMI (2021). Montserrat — Halfway on the Road to 100 Percent Renewables. https://rmi.org/resources/monserrat-halfway-on-the-road-to-100-percent-renewables/
Chicago
RMI. Montserrat — Halfway on the Road to 100 Percent Renewables. 2021. https://rmi.org/resources/monserrat-halfway-on-the-road-to-100-percent-renewables/.
Wikipedia
{{cite report |author=RMI |title=Montserrat — Halfway on the Road to 100 Percent Renewables |date=8 November 2021 |url=https://rmi.org/resources/monserrat-halfway-on-the-road-to-100-percent-renewables/ |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{rmi2021montserrat, author = {{RMI}}, title = {{Montserrat — Halfway on the Road to 100 Percent Renewables}}, institution = {RMI}, year = {2021}, month = nov, url = {https://rmi.org/resources/monserrat-halfway-on-the-road-to-100-percent-renewables/}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated