High Voltage, High Reward Transmission
Summary
The report finds that large-scale transmission projects in the US are cost-effective, with analyzed projects delivering benefits that exceed their costs and often surpass original expectations and regulatory standards.
Key insights
- An analysis of seven regional and inter-regional transmission projects across the US, spanning from California to Oklahoma, indicates that every project delivered benefits that exceeded its costs, resulting in lower electricity costs and improved grid reliability.
- Transmission projects designed for economic benefits outperformed original planning expectations and all significantly exceeded the Federal Energy Regulatory Commission’s (FERC) benefit-to-cost ratio standard of 1.25. Furthermore, the three projects that had pre-existing benefit-cost analyses (BCAs) exceeded the ratios anticipated in their original plans.
- Large-scale projects driven by reliability needs provided unintended economic benefits; while not mandated to meet FERC's 1.25 benefit-to-cost standard, these projects still approached or exceeded that threshold.
Cite the original document
- APA
- RMI (2025). High Voltage, High Reward Transmission. https://rmi.org/resources/high-voltage-high-reward-transmission/
- Chicago
- RMI. High Voltage, High Reward Transmission. 2025. https://rmi.org/resources/high-voltage-high-reward-transmission/.
- Wikipedia
- {{cite report |author=RMI |title=High Voltage, High Reward Transmission |date=26 February 2025 |url=https://rmi.org/resources/high-voltage-high-reward-transmission/ |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{rmi2025high, author = {{RMI}}, title = {{High Voltage, High Reward Transmission}}, institution = {RMI}, year = {2025}, month = feb, url = {https://rmi.org/resources/high-voltage-high-reward-transmission/}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated