This briefing argues that the Cambo oil field project should be cancelled because it is inconsistent with global 1.5C warming limits and offers minimal domestic economic or energy security benefits. The most critical finding is that the project's emissions intensity is triple that of oil produced in Norway and contradicts IEA and UNEP recommendations to end new fossil fuel investments.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Cambo oil field's first phase aims to extract 150 million barrels of crude oil between 2025 and 2050, with a second phase likely to extract a similar amount, making it one of the largest fields in the UK.
  • The oil from the Cambo field is a heavy grade with an average emissions intensity of 23 kgCO2e/barrel, which is higher than the UK Continental Shelf average and three times the intensity of oil produced in Norway.
  • The project is inconsistent with international climate benchmarks, specifically the UNEP Production Gap report's call for supply reductions and the IEA's Net Zero by 2050 roadmap, which states that investment in new oil and gas fields must end immediately to reach net zero by 2050.
  • The project offers limited domestic benefits: construction and installation contracts have been awarded to overseas firms, 80% of UK crude is exported, and the majority owner, Siccar Point Energy, paid no net tax between 2015 and 2019, receiving £41 million in decommissioning tax relief instead.
  • The development is high risk due to the technical complexity and harsh conditions of the West of Shetland region, which has seen other projects suffer severe cost overruns and drive producers to bankruptcy.
  • A loophole in the UK government's proposed climate compatibility checkpoint means the Cambo field will not be assessed for compatibility with climate objectives because the checkpoint only applies to new licenses.
  • The project contradicts a Dutch court ruling requiring Shell, a 30% stakeholder in Cambo, to reduce its emissions by 45% by 2030, which implies forgoing new oil and gas investments.
  • The increasing role of private equity in the UK Continental Shelf, exemplified by Siccar Point Energy's backing by Blackstone and Blue Water Energy, reduces accountability and immunity to market-driven transition pressures.

Cite the original document

APA
Resource Justice Network (2021). Cambo Briefing. https://www.pwyp.org/wp-content/uploads/2015/03/Cambo-Briefing-300621-E3G.pdf
Chicago
Resource Justice Network. Cambo Briefing. 2021. https://www.pwyp.org/wp-content/uploads/2015/03/Cambo-Briefing-300621-E3G.pdf.
Wikipedia
{{cite report |author=Resource Justice Network |title=Cambo Briefing |date=30 June 2021 |url=https://www.pwyp.org/wp-content/uploads/2015/03/Cambo-Briefing-300621-E3G.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document resjust-000458)}}
BibTeX
@techreport{resourcejusticenetwork2021cambo, author = {{Resource Justice Network}}, title = {{Cambo Briefing}}, institution = {Resource Justice Network}, year = {2021}, month = jun, url = {https://www.pwyp.org/wp-content/uploads/2015/03/Cambo-Briefing-300621-E3G.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document resjust-000458} }

Full text

Collected · Record updated