The document outlines the requirements of FERC Order No. 1920, which mandates that transmission providers develop at least three diverse Long-Term Scenarios over a 20-year horizon to plan electric transmission. It emphasizes that state participation is critical for these scenarios to accurately reflect state policies and priorities, particularly within the PJM Interconnection LLC.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • FERC Order No. 1920 requires transmission providers to create a minimum of three diverse Long-Term Scenarios that project transmission needs over a 20-year period, including an assessment of these scenarios under the stress of an extreme weather event.
  • Long-Term Scenarios must incorporate seven categories of factors that influence transmission needs, which specifically include state policies that impact electricity supply and demand either directly or indirectly.
  • Active participation from state entities—such as governors' offices, energy and air quality regulators, and public utility commissioners—is necessary to ensure that planning scenarios represent plausible futures and state priorities.

Cite the original document

APA
Stein, J. D. C. G. P. M. L. K. M. E. B. (2024). Guide to State Participation in PJM Long-Term Scenario Development under FERC Order No. 1920. Institute for Policy Integrity. https://policyintegrity.org/publications/detail/guide-to-state-participation-in-pjm-long-term-scenario-development-under-ferc-order-no-1920
Chicago
Stein, Jennifer Danis, Christoph Graf, Ph.D., Matthew Lifson, Kelly McGee, Elizabeth B. Guide to State Participation in PJM Long-Term Scenario Development under FERC Order No. 1920. Institute for Policy Integrity, 2024. https://policyintegrity.org/publications/detail/guide-to-state-participation-in-pjm-long-term-scenario-development-under-ferc-order-no-1920.
Wikipedia
{{cite report |last1=Stein |first1=Jennifer Danis, Christoph Graf, Ph.D., Matthew Lifson, Kelly McGee, Elizabeth B. |title=Guide to State Participation in PJM Long-Term Scenario Development under FERC Order No. 1920 |publisher=Institute for Policy Integrity |date=9 December 2024 |url=https://policyintegrity.org/publications/detail/guide-to-state-participation-in-pjm-long-term-scenario-development-under-ferc-order-no-1920 |access-date=23 October 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{stein2024guide, author = {Stein, Jennifer Danis, Christoph Graf, Ph.D., Matthew Lifson, Kelly McGee, Elizabeth B.}, title = {{Guide to State Participation in PJM Long-Term Scenario Development under FERC Order No. 1920}}, institution = {Institute for Policy Integrity}, year = {2024}, month = dec, url = {https://policyintegrity.org/publications/detail/guide-to-state-participation-in-pjm-long-term-scenario-development-under-ferc-order-no-1920}, urldate = {2026-10-23}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated