Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report finds that 44% of surveyed health centers in Jharkhand lack electricity, and argues that integrating DRE could save the state up to INR 559 crore and avoid 0.8 million tonnes of CO2 emissions over 25 years.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • A primary survey of 607 health centers in Jharkhand revealed that 44% are un-electrified, and among those electrified, 55.9% experience fluctuating power supply and 89% face daily power outages exceeding eight hours.
  • The report projects that power demand in Jharkhand's health sector will reach 175 MW in an optimistic scenario, compared to 40 MW in a business-as-usual (BAU) scenario.
  • Implementing DRE in the health sector could result in significant financial savings over a 25-year plant lifetime: INR 227 crore in the BAU scenario and INR 559 crore in the optimistic scenario.
  • The transition to DRE in the health sector is estimated to avoid 0.4 million tonnes of CO2 in the BAU scenario and 0.8 million tonnes of CO2 in the optimistic scenario over 25 years.
  • Poor cold-chain management due to inconsistent power supplies leads to approximately 25% of all vaccines delivered to health facilities being wasted during storage and transit.
  • The report identifies a significant gap in health spending in Jharkhand, which spends INR 428 per person per year, less than half of the Indian national average of INR 724.
  • Economic analysis shows that solarizing a Community Health Center (CHC) with battery backup has a payback period of six years and can save approximately INR 10 crore over 25 years.
  • The Jharkhand Renewable Energy Development Agency (JREDA) has already installed over 423 solar photovoltaic systems with a cumulative capacity of about 7 MWp since 2015.

Cite the original document

APA
Ashok, A., Prasad, M., Abhishek, S., & Gaurav, K. (2022). RE-Powering Health Sector in Jharkhand. Power for All. https://www.powerforall.org/application/files/2016/6074/5141/DRE_Booklet_final_1.pdf
Chicago
Ashok, Ashwani, Mukesh Prasad, Satyam Abhishek, and Kumar Gaurav. RE-Powering Health Sector in Jharkhand. Power for All, 2022. https://www.powerforall.org/application/files/2016/6074/5141/DRE_Booklet_final_1.pdf.
Wikipedia
{{cite report |last1=Ashok |first1=Ashwani |last2=Prasad |first2=Mukesh |last3=Abhishek |first3=Satyam |last4=Gaurav |first4=Kumar |title=RE-Powering Health Sector in Jharkhand |publisher=Power for All |date=July 2022 |url=https://www.powerforall.org/application/files/2016/6074/5141/DRE_Booklet_final_1.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document pfall-000054)}}
BibTeX
@techreport{ashok2022repowering, author = {Ashok, Ashwani and Prasad, Mukesh and Abhishek, Satyam and Gaurav, Kumar}, title = {{RE-Powering Health Sector in Jharkhand}}, institution = {Power for All}, year = {2022}, month = jul, url = {https://www.powerforall.org/application/files/2016/6074/5141/DRE_Booklet_final_1.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document pfall-000054} }

Full text

Collected · Record updated