Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This guide outlines the mandatory procurement processes for OSS-funded projects, emphasizing open competition, transparency, and the requirement for OSS 'no-objection' notices for high-value contracts.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Procurement methods are determined by the contract value: international competitive bidding is required for engagements equal to or exceeding 30,000 US dollars, national competitive bidding for those between 8,000 and 30,000 US dollars, and a negotiated competitive procedure without publication for those under 8,000 US dollars.
  • The OSS employs a 'no-objection' (ANO) system where the Observatory must review and approve key stages of the procurement process, including the bidding documents, evaluation reports, and award recommendations, before the beneficiary can proceed.
  • For intellectual services, the OSS primarily uses the Quality and Cost-Based Selection (QCBS) method, which weights technical and financial proposals, typically requiring a minimum technical score between 70 and 85 out of 100.
  • The OSS allows for preferences in favor of the beneficiary's country, including a 15% price margin for locally manufactured supplies and a 7.5% margin for national contractors in works contracts, subject to OSS agreement.
  • Strict ethical standards are enforced; the OSS will reject award proposals or declare a procurement non-compliant if it determines that corruption, fraudulent, collusive, coercive, or obstructive practices occurred.
  • Direct agreement (gré à gré) is an exceptional procurement mode permitted only under specific conditions, such as for complementary contracts, unique suppliers, or emergency responses to natural disasters, and requires OSS non-objection.
  • Beneficiaries must maintain a detailed Procurement Plan, including all contracts to be initiated within the first 18 months of project execution, and update it at least annually.
  • The OSS may declare a procurement non-compliant and cancel the associated funding if the contract was not awarded according to the Financing Agreement, if unjustifiable delays occurred, or if fraud was involved.

Cite the original document

APA
Sahara and Sahel Observatory (2023). REGLES DE PASSATION DES MARCHES DE L’OSS. https://www.oss-online.org/sites/default/files/2025-08/OSS-BeneficiariesProcurementRules_Fr.pdf
Chicago
Sahara and Sahel Observatory. REGLES DE PASSATION DES MARCHES DE L’OSS. 2023. https://www.oss-online.org/sites/default/files/2025-08/OSS-BeneficiariesProcurementRules_Fr.pdf.
Wikipedia
{{cite report |author=Sahara and Sahel Observatory |title=REGLES DE PASSATION DES MARCHES DE L’OSS |date=July 2023 |url=https://www.oss-online.org/sites/default/files/2025-08/OSS-BeneficiariesProcurementRules_Fr.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document osson-000060)}}
BibTeX
@techreport{saharaandsahelobservatory2023regles, author = {{Sahara and Sahel Observatory}}, title = {{REGLES DE PASSATION DES MARCHES DE L’OSS}}, institution = {Sahara and Sahel Observatory}, year = {2023}, month = jul, url = {https://www.oss-online.org/sites/default/files/2025-08/OSS-BeneficiariesProcurementRules_Fr.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document osson-000060} }

Full text

Collected · Record updated