Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The OSS Procurement Rules provide a comprehensive framework for the transparent and competitive award of contracts financed by the OSS, mandating specific tender processes based on contract value thresholds.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Procurement methods are determined by the value of the commitment: contracts equal to or greater than 30,000 USD require an international call for tenders; those between 8,000 USD and 30,000 USD require a national call for tenders; and those below 8,000 USD use a competitive negotiated procedure without publication.
  • The OSS employs a 'no-objection' system where beneficiaries must obtain a No Objection Notice (NON) for various stages of the procurement process, including the approval of the Procurement Plan, tender documents, and award recommendations.
  • For intellectual services, the OSS defines four primary selection methods: quality/price ratio (the most common), quality only (SMBQ), determined budget (SMBDB), and Least Cost Selection Method (LCSM).
  • The OSS allows for margins of preference to support the beneficiary's country, including a 15% preference for supplies manufactured locally (Group A and B) and a 7.5% preference for national contractors in works contracts.
  • Direct agreements (over-the-counter contracts) are exceptional and permitted only under specific conditions, such as for complementary work, exclusive patents, emergency situations, or when previous competitive calls were unfruitful.
  • The OSS maintains strict anti-corruption and anti-fraud policies, reserving the right to declare procurement non-compliant and cancel funding if corruption, fraudulent, collusive, coercive, or obstructive practices are discovered.
  • Beneficiaries must maintain a detailed Procurement Plan, which must be updated at least annually and is subject to prior review and no-objection by the OSS.
  • The OSS requires that contracts for supplies, works, and services (excluding consultancy) use international commercial arbitration in a neutral venue for dispute resolution, unless specifically agreed otherwise.

Cite the original document

APA
Sahara and Sahel Observatory (2023). OSS PROCUREMENT RULES. https://www.oss-online.org/sites/default/files/2025-08/OSS-BeneficiariesProcurementRules_Eng.pdf
Chicago
Sahara and Sahel Observatory. OSS PROCUREMENT RULES. 2023. https://www.oss-online.org/sites/default/files/2025-08/OSS-BeneficiariesProcurementRules_Eng.pdf.
Wikipedia
{{cite report |author=Sahara and Sahel Observatory |title=OSS PROCUREMENT RULES |date=July 2023 |url=https://www.oss-online.org/sites/default/files/2025-08/OSS-BeneficiariesProcurementRules_Eng.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document osson-000059)}}
BibTeX
@techreport{saharaandsahelobservatory2023oss, author = {{Sahara and Sahel Observatory}}, title = {{OSS PROCUREMENT RULES}}, institution = {Sahara and Sahel Observatory}, year = {2023}, month = jul, url = {https://www.oss-online.org/sites/default/files/2025-08/OSS-BeneficiariesProcurementRules_Eng.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document osson-000059} }

Full text

Collected · Record updated