Brief - Tumushabe Case | Welcome at Sahara and Sahel Observatory
Summary
This case study details the resolution of a 2022 grievance in Uganda's Kabale District where a suspect of vandalism was allegedly assaulted, resulting in a negotiated settlement by January 2023.
Key insights
- In January 2022, a complaint was filed after concrete pillars installed as part of the EURECCCA project in the Kabale District of Uganda were vandalized.
- The individual apprehended for the vandalism was allegedly subjected to physical assault before being handed over to the police.
- The grievance was resolved through a negotiated settlement and closed by January 2023, with the local authorities handling the criminal jurisdiction while the GCGHU provided oversight.
Cite the original document
- APA
- Sahara and Sahel Observatory (n.d.). Brief - Tumushabe Case | Welcome at Sahara and Sahel Observatory. https://www.oss-online.org/en/node/1017
- Chicago
- Sahara and Sahel Observatory. Brief - Tumushabe Case | Welcome at Sahara and Sahel Observatory. n.d. https://www.oss-online.org/en/node/1017.
- Wikipedia
- {{cite report |author=Sahara and Sahel Observatory |title=Brief - Tumushabe Case | Welcome at Sahara and Sahel Observatory |url=https://www.oss-online.org/en/node/1017 |access-date=5 November 2026 |via=Climate Insights Directory (document osson-000037)}}
- BibTeX
- @techreport{saharaandsahelobservatoryndbrief, author = {{Sahara and Sahel Observatory}}, title = {{Brief - Tumushabe Case | Welcome at Sahara and Sahel Observatory}}, institution = {Sahara and Sahel Observatory}, url = {https://www.oss-online.org/en/node/1017}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document osson-000037} }
Full text
Collected · Record updated