Brief - L'affaire Tumushabe | Bienvenue à l'Observatoire du Sahara et du Sahel
Summary
This case study details the resolution of a 2022 vandalism incident involving the EURECCCA project in Uganda, which was settled through a negotiated agreement in January 2023.
Key insights
- In January 2022, a complaint was filed after concrete pillars installed as part of the EURECCCA project in the Kabale district of Uganda were vandalized.
- The case involved reports of physical assault against the perpetrator before their transfer following an arrest by local police.
- Following the agreement between the Sahara and Sahel Observatory (OSS) and local authorities, the matter was handled by local institutions and resolved via a negotiated settlement in January 2023.
Cite the original document
- APA
- Sahara and Sahel Observatory (n.d.). Brief - L'affaire Tumushabe | Bienvenue à l'Observatoire du Sahara et du Sahel. https://www.oss-online.org/fr/node/1017
- Chicago
- Sahara and Sahel Observatory. Brief - L'affaire Tumushabe | Bienvenue à l'Observatoire du Sahara et du Sahel. n.d. https://www.oss-online.org/fr/node/1017.
- Wikipedia
- {{cite report |author=Sahara and Sahel Observatory |title=Brief - L'affaire Tumushabe | Bienvenue à l'Observatoire du Sahara et du Sahel |url=https://www.oss-online.org/fr/node/1017 |access-date=5 November 2026 |via=Climate Insights Directory (document osson-000004)}}
- BibTeX
- @techreport{saharaandsahelobservatoryndbrief, author = {{Sahara and Sahel Observatory}}, title = {{Brief - L'affaire Tumushabe | Bienvenue à l'Observatoire du Sahara et du Sahel}}, institution = {Sahara and Sahel Observatory}, url = {https://www.oss-online.org/fr/node/1017}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document osson-000004} }
Full text
Collected · Record updated