Bank Dunia Mempercepat Pengembangan Batubara di Indonesia

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report by Oil Change International asserts that the World Bank Group is actively promoting coal development in Indonesia through policy loans, guarantees, and transaction advisory services, specifically highlighting the the Batang coal-fired power plant project.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The World Bank Group has provided four Infrastructure Development Policy Loans (IDPL) totaling US$850 million since 2007 to support Indonesia's infrastructure development, including the 'Fast Track' energy programs which are predominantly coal-based.
  • The World Bank supported the creation of the Indonesia Infrastructure Guarantee Fund (IIGF), which provides government guarantees that make coal projects more attractive to private investors by reducing risk and offering longer tenors than commercial insurance.
  • The World Bank's International Finance Corporation (IFC) acted as a transaction advisor for the Batang coal-fired power plant project, helping to increase its capacity from an initial 600-800 MW to 2,000 MW.
  • The Batang coal-fired power plant project has faced significant local opposition, including lawsuits and violent clashes between residents and security forces.
  • The World Bank's involvement in the Batang project occurred through 'back-door' mechanisms like financing intermediaries and off-budget grants, allowing the project to bypass the World Bank's own strict criteria for coal loans, including the consideration of alternatives and carbon cost internalization.
  • Despite Indonesia's vast geothermal potential—estimated at 28 GW or 40% of the world's resources—the World Bank has been slow to provide sufficient support for geothermal energy, with only 1.2 GW developed so far.
  • The World Bank's IDPL program has promoted Public-Private Partnership (PPP) investment frameworks that provide subsidies to private investors in fossil fuel projects through tax exemptions and government guarantees, undermining Indonesia's G20 commitment to phase out fossil fuel subsidies.

Cite the original document

APA
Oil Change International (2013). Bank Dunia Mempercepat Pengembangan Batubara di Indonesia. https://www.oilchange.org/wp-content/uploads/2013/09/OCI_World_Bank_Indonesia_Coal_09_2013_Bahasa.pdf
Chicago
Oil Change International. Bank Dunia Mempercepat Pengembangan Batubara di Indonesia. 2013. https://www.oilchange.org/wp-content/uploads/2013/09/OCI_World_Bank_Indonesia_Coal_09_2013_Bahasa.pdf.
Wikipedia
{{cite report |author=Oil Change International |title=Bank Dunia Mempercepat Pengembangan Batubara di Indonesia |date=September 2013 |url=https://www.oilchange.org/wp-content/uploads/2013/09/OCI_World_Bank_Indonesia_Coal_09_2013_Bahasa.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document oilcha-000565)}}
BibTeX
@techreport{oilchangeinternational2013bank, author = {{Oil Change International}}, title = {{Bank Dunia Mempercepat Pengembangan Batubara di Indonesia}}, institution = {Oil Change International}, year = {2013}, month = sep, url = {https://www.oilchange.org/wp-content/uploads/2013/09/OCI_World_Bank_Indonesia_Coal_09_2013_Bahasa.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document oilcha-000565} }

Full text

Collected · Record updated