The Vanishing Need for the Atlantic Coast Pipeline

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This briefing concludes that the Atlantic Coast Pipeline faces significant financial risk because its primary customers, regulated utilities, have revised their natural gas demand forecasts downward and may fail to get cost recovery approved by state regulators.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Atlantic Coast Pipeline (ACP) is a 600-mile project with costs that have risen approximately 30% from an original estimate of $5.1 billion to between $6.5 and $7 billion, excluding financing costs.
  • Ninety-six percent of the pipeline's capacity is contracted to six companies, all of which are regulated utility affiliates of the project's sponsors: Dominion, Duke Energy, and Southern Company.
  • Dominion Virginia Power's 2018 Integrated Resource Plan (IRP) indicates that in four out of five plausible future scenarios, natural gas consumption in 2033 will be equal to or lower than 2019 levels.
  • The Virginia State Corporation Commission rejected Dominion's 2018 IRP, citing doubts about the accuracy of the company's load forecast, which was higher than the 0.9% annual growth forecast by the regional transmission organization PJM.
  • Duke Energy has delayed the construction of new natural gas plants originally planned for 2020-2022 to 2027-2028 due to downward revisions of its load forecasts.
  • Utility-scale wind and solar, especially when combined with battery storage, are becoming more cost-competitive than natural gas combined cycle (CCGT) generation in the United States.
  • There is a significant risk that state utility regulators in Virginia and North Carolina will not approve the pass-through of pipeline costs to ratepayers if the capacity is underutilized.

Cite the original document

APA
Kunkel, C., & Stockman, L. (2019). The Vanishing Need for the Atlantic Coast Pipeline. Oil Change International. https://oilchange.org/wp-content/uploads/2019/01/IEEFA-OCI-No-Need-For-Atlantic-Coast-Pipeline_January-2019-Final.pdf
Chicago
Kunkel, Cathy, and Lorne Stockman. The Vanishing Need for the Atlantic Coast Pipeline. Oil Change International, 2019. https://oilchange.org/wp-content/uploads/2019/01/IEEFA-OCI-No-Need-For-Atlantic-Coast-Pipeline_January-2019-Final.pdf.
Wikipedia
{{cite report |last1=Kunkel |first1=Cathy |last2=Stockman |first2=Lorne |title=The Vanishing Need for the Atlantic Coast Pipeline |publisher=Oil Change International |date=January 2019 |url=https://oilchange.org/wp-content/uploads/2019/01/IEEFA-OCI-No-Need-For-Atlantic-Coast-Pipeline_January-2019-Final.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document oilcha-000475)}}
BibTeX
@techreport{kunkel2019vanishing, author = {Kunkel, Cathy and Stockman, Lorne}, title = {{The Vanishing Need for the Atlantic Coast Pipeline}}, institution = {Oil Change International}, year = {2019}, month = jan, url = {https://oilchange.org/wp-content/uploads/2019/01/IEEFA-OCI-No-Need-For-Atlantic-Coast-Pipeline_January-2019-Final.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document oilcha-000475} }

Full text

Collected · Record updated