Browse all documents

Initiating a fair and inclusive energy transition in Indonesia

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This research paper analyzes the Indonesian government's plan to replace 3.4GW of coal-based power generation at Suralaya with grid-connected solar PV capacity in the Java-Bali grid, evaluating the potential impacts on Sustainable Development Goals (SDGs) and identifying necessary policy and international support mechanisms.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Indonesian government intends to replace 3.4GW of coal units at Suralaya with new grid-connected solar PV capacity within the Java-Bali grid. While a full replacement of Suralaya is possible within four years, a lack of concerted effort could result in a delay of 7 to 10 years.
  • To facilitate the transition, Indonesia requires improvements in spatial planning, the streamlining of permitting processes, and the establishment of a predictable medium-term pathway for clean energy to replace fossil fuels. Additionally, stable policies are necessary to support large-scale investments in manufacturing and capacity.
  • The phase-out of Indonesia's total 35 GW fleet of coal plants is essential for the country to reach zero emissions power generation.
  • International support for Indonesia's energy transition is most likely to be successful if five conditions are met simultaneously: establishing credible clean energy targets and favorable policy conditions, negotiating a coal exit strategy, addressing legacy energy system vulnerabilities, strengthening international climate pledges, and creating a framework for ongoing dialogue.
  • International assistance is unlikely to materialize if it is not matched by domestic efforts to accelerate the transition; for instance, there is little incentive for international parties to buy out old coal plants if new ones are built to replace them.

Cite the original document

APA
NewClimate Institute (2022). Initiating a fair and inclusive energy transition in Indonesia. http://www.newclimate.org/resources/publications/initiating-a-fair-and-inclusive-energy-transition-in-indonesia
Chicago
NewClimate Institute. Initiating a fair and inclusive energy transition in Indonesia. 2022. http://www.newclimate.org/resources/publications/initiating-a-fair-and-inclusive-energy-transition-in-indonesia.
Wikipedia
{{cite report |author=NewClimate Institute |title=Initiating a fair and inclusive energy transition in Indonesia |date=31 March 2022 |url=http://www.newclimate.org/resources/publications/initiating-a-fair-and-inclusive-energy-transition-in-indonesia |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{newclimateinstitute2022initiating, author = {{NewClimate Institute}}, title = {{Initiating a fair and inclusive energy transition in Indonesia}}, institution = {NewClimate Institute}, year = {2022}, month = mar, url = {http://www.newclimate.org/resources/publications/initiating-a-fair-and-inclusive-energy-transition-in-indonesia}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated