Socioeconomic Data Collection Phase: Background Information Flyer and Meeting Presentations

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document outlines the ESIA process and technical specifications for the Lokichar-Lamu Crude Oil Pipeline, a joint venture between the Kenyan government and a consortium including Tullow Oil, Africa Oil Turnana, and Total Oil. The pipeline is designed to transport heavy crude oil from the Lokichar basin to a marine export terminal at the Port of Lamu. It details the stakeholder engagement process, the construction methodology involving trenching and backfilling, and key technical parameters such as a length of approximately 820 km and the inclusion of 16 intermediary stations.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Lokichar-Lamu Crude Oil Pipeline is a joint partnership between the Kenya Government and a consortium consisting of Tullow Oil Kenya B.V., Africa Oil Turnana Ltd, and Total Oil (formerly Maersk Oil).
  • The proposed pipeline will span approximately 820 km, starting in Turkana county and crossing Samburu, Isiolo, Meru, Garissa, and Lamu counties to terminate at a marine export terminal at the Port of Lamu.
  • Technical specifications for the pipeline include a buried depth of approximately 0.9 meters, the use of a Long Line Trace System for heating waxy crude oil, and the inclusion of 16 optimized intermediary stations.
  • The marine terminal at the Port of Lamu will feature storage facilities with a capacity of 1.5 million barrels, consisting of three 500,000 barrel tanks, along with a loading line and marine platform.
  • The ESIA process, governed by the Environment Management and Co-Ordination Act (1999), involves a scoping study, the development of Terms of Reference, and an Environmental Impact Study, with a target completion date of March 2019.

Cite the original document

APA
Natural Justice (2019). Socioeconomic Data Collection Phase: Background Information Flyer and Meeting Presentations. https://naturaljustice.org/wp-content/uploads/2021/01/Project-posters-outlining-project-details_Merged.pdf
Chicago
Natural Justice. Socioeconomic Data Collection Phase: Background Information Flyer and Meeting Presentations. 2019. https://naturaljustice.org/wp-content/uploads/2021/01/Project-posters-outlining-project-details_Merged.pdf.
Wikipedia
{{cite report |author=Natural Justice |title=Socioeconomic Data Collection Phase: Background Information Flyer and Meeting Presentations |date=August 2019 |url=https://naturaljustice.org/wp-content/uploads/2021/01/Project-posters-outlining-project-details_Merged.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{naturaljustice2019socioeconomic, author = {{Natural Justice}}, title = {{Socioeconomic Data Collection Phase: Background Information Flyer and Meeting Presentations}}, institution = {Natural Justice}, year = {2019}, month = aug, url = {https://naturaljustice.org/wp-content/uploads/2021/01/Project-posters-outlining-project-details_Merged.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated