This document is a Terms of Reference (ToR) prepared by Kurrent Technologies Ltd. for the National Environment Management Authority (NEMA) to guide an Environmental and Social Impact Assessment (ESIA) for a proposed 1,050MW coal-fired power plant in Lamu County, Kenya. The project, proposed by Amu Power Company Limited, aims to increase Kenya's generation capacity to meet growing electricity demand using super-critical technology.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Amu Power Company Limited (APCL), sponsored by Gulf Energy Limited and Centum Investment Company Ltd., proposes to build a 1,050MW coal-fired power plant in the Kwasasi area of Hindi/Magogoni sub-county, Lamu County, Kenya.
  • The power plant will use super-critical technology to generate a gross electrical output of 1,050MW, with 68.5MW used for internal operations and 981.5MW exported to the national grid via a 400kV transmission line to Nairobi.
  • The Government of Kenya, through the Lapsset Corridor Development Authority (LCDA), has allocated 394.9 hectares (975.4 acres) of land in the Manda Bay area for the project.
  • The project is part of a broader government plan to increase generation capacity from 1,664MW (October 2013) to 6,700MW (by October 2017) to reduce generation capacity costs from US cents 11.30 to 7.41.
  • The ESIA will include specialist studies on thermal plume modeling in Manda Bay, as the plant's once-through seawater cooling system is expected to create a temperature differential of approximately 9°C, exceeding the 3°C limit set by World Bank Group and Kenyan regulations.
  • The ESIA will assess impacts on the Lamu World Heritage Site, specifically Lamu Old Town, which was named a UNESCO World Heritage Site in 2001.
  • The project will generate significant waste, including Coal Combustion Products (CCPs) such as bottom ash, fly ash, and gypsum, which must be managed in a county that currently lacks waste management infrastructure.
  • The construction phase is expected to be a large-scale operation employing over 3,500 workers at its peak.
  • Land acquisition and the resulting Resettlement Action Plan (RAP) for Project Affected Persons (PAPs) are the responsibility of the Government of Kenya, not the proponent.
  • The ESIA will be conducted in accordance with Kenyan law (Environment Management and Coordination Act, 1999), African Development Bank (AfDB) Operational safeguards, and International Finance Corporation (IFC) Performance Standards.

Cite the original document

APA
Natural Justice (n.d.). comprehensive-summary-of-the-project-report-tor-fe48b8cee568b2ee.pdf. https://naturaljustice.org/wp-content/uploads/2021/01/Comprehensive-Summary-of-the-Project-Report-TOR.pdf
Chicago
Natural Justice. comprehensive-summary-of-the-project-report-tor-fe48b8cee568b2ee.pdf. n.d. https://naturaljustice.org/wp-content/uploads/2021/01/Comprehensive-Summary-of-the-Project-Report-TOR.pdf.
Wikipedia
{{cite report |author=Natural Justice |title=comprehensive-summary-of-the-project-report-tor-fe48b8cee568b2ee.pdf |url=https://naturaljustice.org/wp-content/uploads/2021/01/Comprehensive-Summary-of-the-Project-Report-TOR.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{naturaljusticendcomprehensivesummaryoftheprojectreporttorfe48b8cee568b2eepdf, author = {{Natural Justice}}, title = {{comprehensive-summary-of-the-project-report-tor-fe48b8cee568b2ee.pdf}}, institution = {Natural Justice}, url = {https://naturaljustice.org/wp-content/uploads/2021/01/Comprehensive-Summary-of-the-Project-Report-TOR.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated