The report outlines a pathway for the concrete and cement sector to reach net zero by 2050 through a combination of demand reduction, clinker substitution, and carbon capture. Its most important finding is that while the transition is possible, it requires the rapid deployment of carbon capture, utilisation, or storage (CCU/S) to address remaining process and heat emissions.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The concrete and cement sector contributes 7%–8% of global CO2 emissions, with 88% of these emissions occurring during the clinker-making phase.
  • To stay within a 1.5°C carbon budget of 47 Gt CO2, the sector must implement three primary levers: increasing concrete efficiency, reducing process emissions (via lower clinker content and alternative chemistries), and bringing remaining production emissions close to zero.
  • Efficiency improvements in design and construction, such as topology optimisation and extending building life spans, could reduce global concrete demand and cumulative emissions by 22% (11 Gt CO2) by 2050.
  • Reducing the global average clinker-binder ratio from 0.63 to 0.52 by 2050 through the use of supplementary cementitious materials (SCMs) could deliver 18% of cumulative emissions savings and reduce costs by 5%–15%.
  • Heat-related emissions, which account for 35% of sector emissions, can be reduced by replacing fossil fuels with waste, hydrogen, or electrification, though hydrogen and electric kilns are currently at a low technology readiness level (TRL 4-6).
  • Carbon capture, utilisation, or storage (CCU/S) is essential for remaining emissions, with a required scale of 1.2 to 1.6 Gt of CO2 per year by 2050, necessitating that 90% of existing production sites be equipped with capture technology.
  • The total investment required for the transition is estimated at $1,400 billion, a 35% increase over the base scenario, driven largely by the $440 billion needed for low-carbon power and CO2 transport and storage infrastructure.
  • The 'green premium' for net-zero concrete is expected to be relatively low for end-users, increasing building construction costs by only 1.5%–3%, although cement producers would face a 40%–120% increase in cement costs.
  • Critical 2030 milestones include reducing the global average clinker-binder ratio to 0.54-0.58 and having 33-45 operational zero-carbon plants equipped with carbon capture technology.

Cite the original document

APA
Mission Possible Partnership (2023). MAKING NET-ZERO CONCRETE AND CEMENT POSSIBLE. https://missionpossiblepartnership.org/wp-content/uploads/2026/09/Making-Net-Zero-Concrete-and-Cement-Possible-Report.pdf
Chicago
Mission Possible Partnership. MAKING NET-ZERO CONCRETE AND CEMENT POSSIBLE. 2023. https://missionpossiblepartnership.org/wp-content/uploads/2026/09/Making-Net-Zero-Concrete-and-Cement-Possible-Report.pdf.
Wikipedia
{{cite report |author=Mission Possible Partnership |title=MAKING NET-ZERO CONCRETE AND CEMENT POSSIBLE |date=2023 |url=https://missionpossiblepartnership.org/wp-content/uploads/2026/09/Making-Net-Zero-Concrete-and-Cement-Possible-Report.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document missposs-000022)}}
BibTeX
@techreport{missionpossiblepartnership2023making, author = {{Mission Possible Partnership}}, title = {{MAKING NET-ZERO CONCRETE AND CEMENT POSSIBLE}}, institution = {Mission Possible Partnership}, year = {2023}, url = {https://missionpossiblepartnership.org/wp-content/uploads/2026/09/Making-Net-Zero-Concrete-and-Cement-Possible-Report.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document missposs-000022} }

Full text

Collected · Record updated