The IRP 2019 identifies an immediate risk of energy shortages due to the declining performance of Eskom's coal fleet and recommends a diversified energy mix including renewables, gas, and a phased nuclear build programme to ensure long-term security.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • There is an immediate risk of significant power shortages and load shedding due to the low energy availability factor (EAF) of Eskom's generation plants and the early shutdown of non-performing units at Grootvlei, Komati, and Hendrina.
  • The plan recommends extending the design life of the Koeberg nuclear power station by another 20 years beyond its 2024 end-of-life date to maintain energy security.
  • To address short-term supply gaps estimated between 2,000 and 3,000 MW, the document proposes a medium-term power purchase programme (MTPPP) to acquire capacity from existing facilities like co-generation and small hydro.
  • The IRP 2019 proposes commencing preparations for a new nuclear build programme of 2,500 MW, implemented at a modular scale and affordable pace, as a 'no-regret' long-term option.
  • The strategy for coal power focuses on High Efficiency Low Emission (HELE) technologies, including carbon capture utilization and storage (CCUS) and underground coal gasification, to comply with environmental requirements.
  • The plan suggests converting existing diesel-fired peaking plants to gas to support the development of gas infrastructure and complement renewable energy.
  • South Africa intends to participate in strategic regional power projects, specifically the Grand Inga Hydropower Project in the DRC, with a 2,500 MW offtake to enable regional energy trading.
  • The document emphasizes a 'just transition' to mitigate the socio-economic impacts of decommissioning approximately 24,100 MW of coal power plants between 2030 and 2050.
  • The IRP maintains annual build limits for wind (1,600 MW) and solar PV (1,000 MW) to ensure a consistent project pipeline and investor confidence.

Cite the original document

APA
JUST SA (2019). Integrated Resource Plan (IRP2019). https://www.justsaportal.org.za/uploads/files/IRP-2019-1.pdf
Chicago
JUST SA. Integrated Resource Plan (IRP2019). 2019. https://www.justsaportal.org.za/uploads/files/IRP-2019-1.pdf.
Wikipedia
{{cite report |author=JUST SA |title=Integrated Resource Plan (IRP2019) |date=October 2019 |url=https://www.justsaportal.org.za/uploads/files/IRP-2019-1.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document justsa-000016)}}
BibTeX
@techreport{justsa2019integrated, author = {{JUST SA}}, title = {{Integrated Resource Plan (IRP2019)}}, institution = {JUST SA}, year = {2019}, month = oct, url = {https://www.justsaportal.org.za/uploads/files/IRP-2019-1.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document justsa-000016} }

Full text

Collected · Record updated