ВОССТАНОВЛЕНИЕ ЖЕЛЕЗНЫХ ДОРОГ НА ЮЖНОМ КАВКАЗЕ: ОЦЕНКА ПОТЕНЦИАЛЬНОГО ЭКОНОМИЧЕСКОГО ЭФФЕКТА
Summary
The report finds that restoring the KGNMB railway would cost 433.7 million USD and represents the most economical transport alternative for the South Caucasus, potentially becoming profitable within 12 years if annual cargo flows reach 4–5 million tons.
Key insights
- The total cost to restore the railway track, provide technical equipment, and build three border stations on Armenian and Azerbaijani sections is estimated at 433.7 million USD. This is broken down as 278.6 million USD for Azerbaijani sections, 104.6 million USD for Armenian sections, and 52 million USD for the Turkish section.
- The KGNMB project is significantly more cost-effective than other alternatives: the Kars–Akhalkalaki–Tbilisi–Baku railway has already exceeded 600 million USD, a proposed Armenia-Iran link is estimated at 2–3 billion USD, and an Azerbaijan-Nakhchivan link via Kars and Georgia is estimated at 1 billion USD.
- The railway's profitability depends on cargo volume: at current levels (1–1.5 million tons), it is not viable. However, if annual cargo flows reach 4–5 million tons, sections totaling 784 km of the 877 km route would begin to pay off after 12 years.
- Armenia would benefit from the route by gaining a rail connection to Turkey and access to Black Sea and Mediterranean ports, and by becoming a transit country for goods moving from Iran to Black Sea ports via the Julfa branch.
- Azerbaijan would gain a direct rail link to the Nakhchivan Autonomous Republic, reducing state budget expenditures on subsidies for air and road transport and stimulating the local economy of Nakhchivan.
- The railway would serve as a critical infrastructure component for the rehabilitation of Azerbaijani districts currently occupied by Armenian forces, facilitating the delivery of construction materials and machinery.
- For Turkey, the economic impact would be most significant in the northern and eastern regions, potentially expanding trade and tourism in areas bordering Armenia.
- The restoration of the railway could significantly lower the cost of exporting iron ore from Armenia's Razdan and Abovyan deposits to China via Turkey, or from the Svarants deposit via Nakhchivan to the port of Bandar-Abbas.
Cite the original document
- APA
- International Alert (2014). ВОССТАНОВЛЕНИЕ ЖЕЛЕЗНЫХ ДОРОГ НА ЮЖНОМ КАВКАЗЕ: ОЦЕНКА ПОТЕНЦИАЛЬНОГО ЭКОНОМИЧЕСКОГО ЭФФЕКТА. https://www.international-alert.org/app/uploads/2021/08/Caucasus-Railways-Rehabilitation-Pt2-RU-2014.pdf
- Chicago
- International Alert. ВОССТАНОВЛЕНИЕ ЖЕЛЕЗНЫХ ДОРОГ НА ЮЖНОМ КАВКАЗЕ: ОЦЕНКА ПОТЕНЦИАЛЬНОГО ЭКОНОМИЧЕСКОГО ЭФФЕКТА. 2014. https://www.international-alert.org/app/uploads/2021/08/Caucasus-Railways-Rehabilitation-Pt2-RU-2014.pdf.
- Wikipedia
- {{cite report |author=International Alert |title=ВОССТАНОВЛЕНИЕ ЖЕЛЕЗНЫХ ДОРОГ НА ЮЖНОМ КАВКАЗЕ: ОЦЕНКА ПОТЕНЦИАЛЬНОГО ЭКОНОМИЧЕСКОГО ЭФФЕКТА |date=2014 |url=https://www.international-alert.org/app/uploads/2021/08/Caucasus-Railways-Rehabilitation-Pt2-RU-2014.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document intalert-000105)}}
- BibTeX
- @techreport{internationalalert2014, author = {{International Alert}}, title = {{ВОССТАНОВЛЕНИЕ ЖЕЛЕЗНЫХ ДОРОГ НА ЮЖНОМ КАВКАЗЕ: ОЦЕНКА ПОТЕНЦИАЛЬНОГО ЭКОНОМИЧЕСКОГО ЭФФЕКТА}}, institution = {International Alert}, year = {2014}, url = {https://www.international-alert.org/app/uploads/2021/08/Caucasus-Railways-Rehabilitation-Pt2-RU-2014.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document intalert-000105} }
Full text
Collected · Record updated