REHABILITATION OF THE RAILWAYS IN THE SOUTH CAUCASUS: ASSESSMENT OF THE POTENTIAL ECONOMIC BENEFITS
Summary
The report finds that rehabilitating the KGNMB railway would cost US$433.7 million and could become profitable within 12 to 13 years if annual freight traffic reaches 4–10 million tons, offering a more economical alternative to other regional rail projects.
Key insights
- The total cost to restore the track bed and technical infrastructure for the KGNMB railway, including three border stations, is estimated at US$433.7 million. This is broken down into US$278.6 million for the Azerbaijani section, US$104.6 million for the Armenian section, and US$52 million for the Turkish section.
- The KGNMB project is more cost-effective than other regional alternatives: the Kars–Akhalkalaki–Tbilisi–Baku (KATB) line has already exceeded US$600 million in costs, the proposed Armenia-Iran link is estimated at US$2–3 billion, and the Azerbaijan-Nakhchivan link via Kars and Georgia is projected at US$1 billion.
- Profitability depends on freight volumes: the Armenian and Azerbaijani sections could be profitable after 13 years with 10 million tons of annual freight, while the Turkish section would require 14 million tons. However, 784km of the 877-km line could pay for itself after 12 years with only 4–5 million tons of annual traffic.
- Armenia would benefit from direct access to Turkish Black Sea and Mediterranean ports, particularly for its extractive industries, and could become a transit country if the line from Julfa to Iran is opened.
- For Azerbaijan, the railway would provide a direct rail link to the Nakhchivan Autonomous Republic, reducing national budget expenditures currently used to subsidize road and air traffic between Nakhchivan and the rest of the country.
- The railway would support the regeneration of Azerbaijani territories currently occupied by Armenian armed forces by facilitating construction projects and creating jobs.
- Turkey would see the most tangible economic effects in its northern and eastern regions, facilitating trade expansion and potentially developing tourism in areas bordering Armenia.
- The rehabilitation of the railway would significantly lower transit costs for Armenian iron ore exports to China, particularly for deposits in Syunik (Svarants) if the route through Nakhchivan is used, or for deposits in Kotayk and Lori if the Kars-Gyumri route is used.
Cite the original document
- APA
- International Alert (2014). REHABILITATION OF THE RAILWAYS IN THE SOUTH CAUCASUS: ASSESSMENT OF THE POTENTIAL ECONOMIC BENEFITS. https://www.international-alert.org/app/uploads/2021/08/Caucasus-Railways-Rehabilitation-Pt2-EN-2014.pdf
- Chicago
- International Alert. REHABILITATION OF THE RAILWAYS IN THE SOUTH CAUCASUS: ASSESSMENT OF THE POTENTIAL ECONOMIC BENEFITS. 2014. https://www.international-alert.org/app/uploads/2021/08/Caucasus-Railways-Rehabilitation-Pt2-EN-2014.pdf.
- Wikipedia
- {{cite report |author=International Alert |title=REHABILITATION OF THE RAILWAYS IN THE SOUTH CAUCASUS: ASSESSMENT OF THE POTENTIAL ECONOMIC BENEFITS |date=2014 |url=https://www.international-alert.org/app/uploads/2021/08/Caucasus-Railways-Rehabilitation-Pt2-EN-2014.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document intalert-000104)}}
- BibTeX
- @techreport{internationalalert2014rehabilitation, author = {{International Alert}}, title = {{REHABILITATION OF THE RAILWAYS IN THE SOUTH CAUCASUS: ASSESSMENT OF THE POTENTIAL ECONOMIC BENEFITS}}, institution = {International Alert}, year = {2014}, url = {https://www.international-alert.org/app/uploads/2021/08/Caucasus-Railways-Rehabilitation-Pt2-EN-2014.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document intalert-000104} }
Full text
Collected · Record updated