The report finds that West Virginia electricity customers will pay more than $440 million for two transmission projects, the MidAtlantic Resiliency Link and Valley Link, which are primarily driven by data center demand in Virginia.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • West Virginia electricity customers are estimated to pay more than $440 million over the next 40 years for the MidAtlantic Resiliency Link (MARL) and Valley Link transmission projects.
  • The MidAtlantic Resiliency Link and Valley Link projects were proposed to address rapidly growing electricity demand in northern Virginia, which is largely driven by data centers.
  • PJM's current cost allocation for baseline transmission projects splits costs 50% among zones expected to benefit and 50% across all zones based on peak demand, which the author argues leads to unfair cross-subsidization for data center infrastructure.
  • Data centers represent at least 85% of the projected load increase in PJM's Dominion Zone.
  • The MidAtlantic Resiliency Link (MARL) project has an estimated total cost of $1.1 billion following a re-route, while the Valley Link project has a PJM independent capital cost estimate of almost $2.3 billion.
  • The report argues that PJM's transmission cost allocation process needs reform because it does not account for state policy decisions, such as Virginia's tax incentives for data centers, that drive infrastructure costs in other states.

Cite the original document

APA
Kunkel, C. (n.d.). West Virginia Ratepayers Footing the Bill for Infrastructure Build Out. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2025-05/UPDATED_West%20Virginia%20Ratepayers%20Footing%20the%20Bill%20for%20Infrastructure_May%202025.pdf
Chicago
Kunkel, Cathy. West Virginia Ratepayers Footing the Bill for Infrastructure Build Out. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2025-05/UPDATED_West%20Virginia%20Ratepayers%20Footing%20the%20Bill%20for%20Infrastructure_May%202025.pdf.
Wikipedia
{{cite report |last1=Kunkel |first1=Cathy |title=West Virginia Ratepayers Footing the Bill for Infrastructure Build Out |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2025-05/UPDATED_West%20Virginia%20Ratepayers%20Footing%20the%20Bill%20for%20Infrastructure_May%202025.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-002047)}}
BibTeX
@techreport{kunkelndwest, author = {Kunkel, Cathy}, title = {{West Virginia Ratepayers Footing the Bill for Infrastructure Build Out}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2025-05/UPDATED_West%20Virginia%20Ratepayers%20Footing%20the%20Bill%20for%20Infrastructure_May%202025.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-002047} }

Full text

Collected · Record updated