Enbridge Should Consider Closing Its Old, Troubled Line 5 Pipeline

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report concludes that Enbridge's plan to replace segments of the 70-year-old Line 5 pipeline is financially ill-advised, as the tunnel project could cost three or more times its initial estimate while the market for its products declines.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Enbridge tunnel pipeline project faces significant cost escalation; while the 2018 estimate was $500 million, a 2022 earnings call cited $750 million, and IEEFA estimates the final cost could be $1.5 billion or more due to construction inflation and design changes.
  • The tunnel's design was enlarged from a 10-foot to a 21-foot interior diameter, which increases the tunnel's volume by 3.67 times and increases water infiltration management challenges by up to 40%.
  • Enbridge faces additional capital costs for a 41.2-mile re-route of Line 5 around the Bad River Reservation in Wisconsin, projected at $450 million in 2024 dollars but likely to reach $500 million or more.
  • Continued operation of the old dual pipeline during the tunnel's construction (which may not start operations until at least 2030) poses severe environmental risks, with potential spill damages estimated between $1.37 billion and $45.8 billion depending on the scenario.
  • Global and regional demand for Line 5's products is on a declining trajectory due to the energy transition, with the IEA projecting global oil demand could drop to 55 million bpd by 2050 if decarbonization pledges are met.
  • Residential propane consumption in the East North Central region of the U.S. is projected to plummet, aided by government rebates for converting homes to electric heat pumps.
  • Enbridge's financial profile is described by Moody's as weak, with a senior unsecured rating downgraded to Baa2 in March 2024, and the company's debt-to-EBITDA ratio reported at 4.9x in the third quarter of 2024.
  • The report argues that investing in the tunnel and re-route creates 'carbon lock-in,' restricting future flexibility and increasing the costs of achieving climate goals by prolonging fossil fuel infrastructure.

Cite the original document

APA
Schlissel, D. (n.d.). Enbridge Should Consider Closing Its Old, Troubled Line 5 Pipeline. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2025-01/Updated%20Authors-Enbridge%20Should%20Consider%20Closing%20Line%205_Report_January%202025_Final.pdf
Chicago
Schlissel, David. Enbridge Should Consider Closing Its Old, Troubled Line 5 Pipeline. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2025-01/Updated%20Authors-Enbridge%20Should%20Consider%20Closing%20Line%205_Report_January%202025_Final.pdf.
Wikipedia
{{cite report |last1=Schlissel |first1=David |title=Enbridge Should Consider Closing Its Old, Troubled Line 5 Pipeline |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2025-01/Updated%20Authors-Enbridge%20Should%20Consider%20Closing%20Line%205_Report_January%202025_Final.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-002042)}}
BibTeX
@techreport{schlisselndenbridge, author = {Schlissel, David}, title = {{Enbridge Should Consider Closing Its Old, Troubled Line 5 Pipeline}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2025-01/Updated%20Authors-Enbridge%20Should%20Consider%20Closing%20Line%205_Report_January%202025_Final.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-002042} }

Full text

Collected · Record updated