Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that India's RTC-1 and RTC-2 tenders are not technically 'round-the-clock' because they do not mandate 100% energy availability, though an RE-plus-thermal model is currently the most viable way to meet their high capacity utilization requirements.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The SECI RTC-1 and RTC-2 tenders do not technically qualify as 'round-the-clock' because the minimum annual energy availability is set at less than 100%.
  • The RTC-1 tender, awarded to ReNew Power at a first-year tariff of Rs2.9/kWh, requires a project design that may necessitate significant oversizing; ReNew Power anticipates needing 900MW of wind and 400MW of solar capacity plus 100 MWh of battery storage for a 400MW project.
  • The RTC-2 tender allows for a technology mix where at least 51% of energy comes from renewable sources (including storage charged by RE), while the remaining 49% can come from operational or under-construction thermal power assets.
  • Financial modelling suggests that the RE-plus-thermal model is currently the most suitable for meeting the assured power supply conditions of the tenders, although RE-plus-BESS is the most viable long-term solution.
  • To improve energy generation, the report suggests deploying high-wattage bifacial modules with single-axis trackers and robotic cleaning, which could increase generation by 18-20%.
  • International examples of demand-based supply include Chile's use of technology-agnostic auctions for specific 'time blocks', Nevada's (USA) on-peak tariffs for storage producers, and Germany's use of Virtual Power Plants (VPPs) to aggregate RE assets.

Cite the original document

APA
Gulia, J., Garg, V., & Thayillam, A. (2021). Understanding Round-the-Clock Tenders in India. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Understanding-Round-the-Clock-Tenders-in-India_November-2021.pdf
Chicago
Gulia, Jyoti, Vibhuti Garg, and Akhil Thayillam. Understanding Round-the-Clock Tenders in India. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/sites/default/files/resources/Understanding-Round-the-Clock-Tenders-in-India_November-2021.pdf.
Wikipedia
{{cite report |last1=Gulia |first1=Jyoti |last2=Garg |first2=Vibhuti |last3=Thayillam |first3=Akhil |title=Understanding Round-the-Clock Tenders in India |publisher=Institute for Energy Economics and Financial Analysis |date=November 2021 |url=https://ieefa.org/sites/default/files/resources/Understanding-Round-the-Clock-Tenders-in-India_November-2021.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-002037)}}
BibTeX
@techreport{gulia2021understanding, author = {Gulia, Jyoti and Garg, Vibhuti and Thayillam, Akhil}, title = {{Understanding Round-the-Clock Tenders in India}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = nov, url = {https://ieefa.org/sites/default/files/resources/Understanding-Round-the-Clock-Tenders-in-India_November-2021.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-002037} }

Full text

Collected · Record updated