This report concludes that the Trans Mountain Expansion project cannot generate sufficient profits to recover its $26.1 billion cost without toll rates that would make Canadian oil uncompetitive in international markets.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The total estimated investment for the Trans Mountain Expansion (TMX) project, including the purchase price and construction costs, is $26.1 billion of taxpayer funds, which the report concludes will never be recovered.
  • To make the TMX project profitable for investors, the projected tolling rate for transport services would need to increase by 100%, which would make Canadian oil uncompetitive in Asian markets.
  • The Canadian government's claim that no more public money will be used to complete the project is misleading, as IEEFA concludes the government will have to guarantee the $8.8 billion in new debt required to finish construction to attract private investors.
  • The project's financial viability is further threatened by the energy transition; the International Energy Agency warns that new oil and gas investment is unwarranted if global temperatures are to be limited to 1.5⁅C, potentially leading to the asset becoming stranded.
  • The $26.1 billion spent on TMX could have instead funded every major wind and solar project in Canada from 2019-2021 five times over, adding 15 gigawatts (GW) to the power supply.
  • Current tolling levels result in a project return of 2.1 percent, which is significantly lower than the 7.1 percent cost of capital, meaning the project is doomed to generate a loss for investors.

Cite the original document

APA
Sanzillo, T., & Mawji, O. (2022). Trans Mountain Expansion Could Never Return the Expected $26.1 Billion Spent by Taxpayers. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-04/Trans-Mountain-Expansion-Could-Never-Return-the-Expected-26-Billion-Spent-by-Taxpayers_March-2022.pdf
Chicago
Sanzillo, Tom, and Omar Mawji. Trans Mountain Expansion Could Never Return the Expected $26.1 Billion Spent by Taxpayers. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/sites/default/files/2022-04/Trans-Mountain-Expansion-Could-Never-Return-the-Expected-26-Billion-Spent-by-Taxpayers_March-2022.pdf.
Wikipedia
{{cite report |last1=Sanzillo |first1=Tom |last2=Mawji |first2=Omar |title=Trans Mountain Expansion Could Never Return the Expected $26.1 Billion Spent by Taxpayers |publisher=Institute for Energy Economics and Financial Analysis |date=March 2022 |url=https://ieefa.org/sites/default/files/2022-04/Trans-Mountain-Expansion-Could-Never-Return-the-Expected-26-Billion-Spent-by-Taxpayers_March-2022.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-002023)}}
BibTeX
@techreport{sanzillo2022trans, author = {Sanzillo, Tom and Mawji, Omar}, title = {{Trans Mountain Expansion Could Never Return the Expected \$26.1 Billion Spent by Taxpayers}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = mar, url = {https://ieefa.org/sites/default/files/2022-04/Trans-Mountain-Expansion-Could-Never-Return-the-Expected-26-Billion-Spent-by-Taxpayers_March-2022.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-002023} }

Full text

Collected · Record updated