Summary
The report concludes that retiring the C.D. McIntosh Unit 3 coal plant is economically and operationally prudent because it is more expensive and less reliable than natural gas and solar alternatives, and its retirement would not compromise regional grid reliability.
Key insights
- C.D. McIntosh Unit 3 has become increasingly expensive to operate, with average production costs increasing by 33% from 2009 to 2013, rising from just under $52 per MWh to over $69 per MWh.
- The plant's reliability has declined, evidenced by an Equivalent Forced Outage Rate (EFOR) significantly higher than the industry average for similar coal plants and higher than other coal units owned by the Orlando Utilities Commission.
- Between October 1, 2008, and September 30, 2014, the joint owners invested more than $70 million in capital expenditures to upgrade or replace plant equipment, averaging nearly $12 million per year.
- Retiring McIntosh Unit 3 would not jeopardize regional grid reliability, as Florida maintains sufficient generating capacity to meet projected peak loads while preserving a 15% capacity reserve margin.
- Generating power at McIntosh Unit 3 is significantly more expensive than purchasing power from natural gas-fired combined cycle plants in Florida; in 2013, the latter was 39% less expensive.
- Florida possesses the third-highest solar-photovoltaic potential of all 50 U.S. states, with a technical potential for 49,000 MW of capacity and 63.897 million MWh of generation.
- Lakeland Electric's 'Business Case 3' in its Strategic Resource Plan demonstrates that aggressive investment in energy conservation and distributed solar PV would result in lower average levelized power supply costs from 2015-2034 compared to other scenarios.
Cite the original document
- APA
- Institute for Energy Economics and Financial Analysis (n.d.). the-time-is-right-to-retire-mcintosh-unit-3_ieefa_oct-2015-7bb3c3a0c2a54827.pdf. https://ieefa.org/wp-content/uploads/2015/10/The-Time-is-Right-to-Retire-McIntosh-Unit-3_IEEFA_Oct-2015.pdf
- Chicago
- Institute for Energy Economics and Financial Analysis. the-time-is-right-to-retire-mcintosh-unit-3_ieefa_oct-2015-7bb3c3a0c2a54827.pdf. n.d. https://ieefa.org/wp-content/uploads/2015/10/The-Time-is-Right-to-Retire-McIntosh-Unit-3_IEEFA_Oct-2015.pdf.
- Wikipedia
- {{cite report |author=Institute for Energy Economics and Financial Analysis |title=the-time-is-right-to-retire-mcintosh-unit-3_ieefa_oct-2015-7bb3c3a0c2a54827.pdf |url=https://ieefa.org/wp-content/uploads/2015/10/The-Time-is-Right-to-Retire-McIntosh-Unit-3_IEEFA_Oct-2015.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-002007)}}
- BibTeX
- @techreport{instituteforenergyeconomicsandfinancialanalysisndthetimeisrighttoretiremcintoshunit3ieefaoct20157bb3c3a0c2a54827pdf, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{the-time-is-right-to-retire-mcintosh-unit-3\_ieefa\_oct-2015-7bb3c3a0c2a54827.pdf}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/wp-content/uploads/2015/10/The-Time-is-Right-to-Retire-McIntosh-Unit-3_IEEFA_Oct-2015.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-002007} }
Full text
Collected · Record updated