This report finds that the Dakota Access Pipeline is likely to become a stranded asset because the Bakken region already has sufficient oil transport capacity to handle current and projected production levels.
Key insights
- Energy Transfer Partners (ETP) is likely to miss its contractual deadline of January 1, 2017, to complete the pipeline, which may give committed shippers the right to rescind their commitments.
- The Bakken region's existing infrastructure—including pipelines, rail facilities, and refineries—can handle nearly 2.5 million barrels of crude per day, meaning approximately 60 percent of current capacity is unutilized.
- Bakken oil production has declined by more than 20 percent as of November 2016 compared to the previous November, and by more than 25 percent from its December 2014 peak.
- Major Bakken drillers, including Whiting Petroleum, Continental Resources, and Hess, have experienced significant revenue declines and credit rating downgrades since 2014.
- The Dakota Access Pipeline is at risk of becoming a stranded asset because existing capacity could handle the region's entire output by the end of 2017, even without the new pipeline.
- Energy Transfer Partners is under extreme financial pressure due to its master limited partnership (MLP) structure and high leverage, which incentivizes the rushed completion of the project to generate cash for investors.
Cite the original document
- APA
- Institute for Energy Economics and Financial Analysis (n.d.). the-high-risk-financing-behind-the-dakota-access-pipeline_-nov-2016-dff32681f934da00.pdf. https://ieefa.org/sites/default/files/resources/The-High-Risk-Financing-Behind-the-Dakota-Access-Pipeline_-NOV-2016.pdf
- Chicago
- Institute for Energy Economics and Financial Analysis. the-high-risk-financing-behind-the-dakota-access-pipeline_-nov-2016-dff32681f934da00.pdf. n.d. https://ieefa.org/sites/default/files/resources/The-High-Risk-Financing-Behind-the-Dakota-Access-Pipeline_-NOV-2016.pdf.
- Wikipedia
- {{cite report |author=Institute for Energy Economics and Financial Analysis |title=the-high-risk-financing-behind-the-dakota-access-pipeline_-nov-2016-dff32681f934da00.pdf |url=https://ieefa.org/sites/default/files/resources/The-High-Risk-Financing-Behind-the-Dakota-Access-Pipeline_-NOV-2016.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001996)}}
- BibTeX
- @techreport{instituteforenergyeconomicsandfinancialanalysisndthehighriskfinancingbehindthedakotaaccesspipelinenov2016dff32681f934da00pdf, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{the-high-risk-financing-behind-the-dakota-access-pipeline\_-nov-2016-dff32681f934da00.pdf}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/resources/The-High-Risk-Financing-Behind-the-Dakota-Access-Pipeline_-NOV-2016.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001996} }
Full text
Collected · Record updated