The report finds that new combined-cycle gas plants are now roughly triple the cost of those built in the early 2020s, making them significantly more expensive than wind and solar paired with battery storage.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Consumers are exposed to significant financial risks from natural gas price spikes caused by geopolitical events and weather, and these risks increase as more gas-fired capacity is added to the grid.
  • The growth of U.S. liquefied natural gas (LNG) exports is expected to increase price volatility and potentially lead to long-term increases in domestic natural gas costs.
  • The capital cost for new combined-cycle gas plants has increased dramatically, with current proposals costing at least $2,500 per kilowatt (kW), which is approximately triple the cost of projects from the early 2020s.
  • Wind and solar power, when paired with dispatchable battery storage, are more cost-effective than new gas plants, with unsubsidized costs for solar and onshore wind ranging from $26 to $54/MWh, compared to an estimated $107/MWh for new combined-cycle gas plants.
  • New gas-fired power plants face a high risk of becoming stranded assets due to their long lifespans, high construction costs, and competition from cheaper, faster-to-deploy renewable energy and storage.
  • Battery storage is rapidly reducing the need for gas generation in markets like California and Texas by providing dispatchable capacity and reducing reliance on gas during peak demand periods.
  • Pipeline construction costs have risen significantly, with a 2025 analysis showing a 90% jump in costs per mile for projects completed or proposed since 2024 compared to those completed before 2024.

Cite the original document

APA
Wamsted, D. (n.d.). The Misguided Stampede to Build Gas Power Plants. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2026-04/The%20Misguided%20Stampede%20To%20Build%20Gas%20Power%20Plants_April%202026.pdf
Chicago
Wamsted, Dennis. The Misguided Stampede to Build Gas Power Plants. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2026-04/The%20Misguided%20Stampede%20To%20Build%20Gas%20Power%20Plants_April%202026.pdf.
Wikipedia
{{cite report |last1=Wamsted |first1=Dennis |title=The Misguided Stampede to Build Gas Power Plants |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2026-04/The%20Misguided%20Stampede%20To%20Build%20Gas%20Power%20Plants_April%202026.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001983)}}
BibTeX
@techreport{wamstedndmisguided, author = {Wamsted, Dennis}, title = {{The Misguided Stampede to Build Gas Power Plants}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2026-04/The%20Misguided%20Stampede%20To%20Build%20Gas%20Power%20Plants_April%202026.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001983} }

Full text

Collected · Record updated