STEAG’s Uncertain and Slow Decarbonisation Strategy

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that STEAG lacks a concrete coal phase-out strategy for its 4.1 GW of capacity, raising the risk that a new private owner will maximize the fleet's lifetime until 2038 to ensure profitability.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • STEAG currently operates 4.1 GW of coal-fired capacity without a published decommissioning strategy, creating a risk that these assets will continue running until the 2038 coal exit date proposed by the German Energiewende.
  • STEAG has the second-highest average CO2 emission factor per MWh among 25 analyzed European utilities, recorded at 927 kg/MWh in 2021.
  • The company's owners, a consortium of six German municipal utilities (KSBG KG), intend to sell STEAG as a whole, which may lead a private buyer to maximize the coal fleet's lifetime for profit.
  • Financial analysis suggests that STEAG's coal assets could remain profitable until 2038 due to forecasted average German spot power prices of 73 €/MWh between 2023 and 2040, making the investment attractive to private buyers at a low acquisition price.
  • The report identifies a pattern where private equity firms or utilities acquire aging thermal assets at low prices and extend their operations to combine generation revenues with decommissioning awards, citing examples such as EPH's acquisitions in Italy and Germany and Riverstone Holdings in the Netherlands and Germany.
  • If STEAG is sold in 2023 without binding decommissioning dates, it could hinder Germany's national target to reduce coal capacity to 8 GW by 2030, as STEAG's 4.1 GW would represent nearly half of the remaining buffer for phase-outs.

Cite the original document

APA
Bruegel, J. (2023). STEAG’s Uncertain and Slow Decarbonisation Strategy. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2023-06/STEAGs%20Uncertain%20and%20Slow%20Decarbonisation%20Strategy_June%202023_Updated.pdf
Chicago
Bruegel, Jonathan. STEAG’s Uncertain and Slow Decarbonisation Strategy. Institute for Energy Economics and Financial Analysis, 2023. https://ieefa.org/sites/default/files/2023-06/STEAGs%20Uncertain%20and%20Slow%20Decarbonisation%20Strategy_June%202023_Updated.pdf.
Wikipedia
{{cite report |last1=Bruegel |first1=Jonathan |title=STEAG’s Uncertain and Slow Decarbonisation Strategy |publisher=Institute for Energy Economics and Financial Analysis |date=June 2023 |url=https://ieefa.org/sites/default/files/2023-06/STEAGs%20Uncertain%20and%20Slow%20Decarbonisation%20Strategy_June%202023_Updated.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001955)}}
BibTeX
@techreport{bruegel2023steags, author = {Bruegel, Jonathan}, title = {{STEAG’s Uncertain and Slow Decarbonisation Strategy}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2023}, month = jun, url = {https://ieefa.org/sites/default/files/2023-06/STEAGs%20Uncertain%20and%20Slow%20Decarbonisation%20Strategy_June%202023_Updated.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001955} }

Full text

Collected · Record updated