This report concludes that small modular reactors (SMRs) are economically unviable and too slow to deploy, arguing that they will not play a significant role in the near-term energy transition. The most important finding is that SMRs consistently suffer from massive cost overruns and schedule delays, making them a poor investment compared to lower-cost, available renewable technologies.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Existing SMR projects worldwide have experienced severe cost escalations. Russian SMRs saw costs climb more than 300% from initial estimates, China's Shidao Bay 1 SMR cost triple its initial projections, and Argentina's CAREM 25 projected costs have risen 600% since 2013.
  • Proposed U.S. SMR projects are showing similar upward cost trends even before securing licenses. NuScale's estimated construction costs more than doubled between 2015 and 2023, rising from $9,964 per kW to $21,561 per kW, leading to the cancellation of its project with UAMPS.
  • SMR construction schedules are consistently overestimated. None of the operating or under-construction SMRs in Russia, China, and Argentina have met their projected three- to four-year construction timelines.
  • The claim that modular construction reduces costs and time is unproven. Previous large-scale projects using modular techniques, such as Georgia Power's Vogtle reactors 3 and 4 and the cancelled V.C. Summer project, still suffered from massive budget overruns and delays.
  • SMRs are likely to be a poor fit for renewable-heavy grids because their high capital costs create a financial incentive to operate at maximum capacity (baseload) to recover investments, which contradicts the claim that they can flexibly 'load-follow' to complement variable renewables.
  • Standardized SMR designs introduce a systemic risk termed the 'Boeing Problem,' where a single design flaw discovered in one reactor could necessitate expensive and difficult repairs or outages across an entire fleet of identical reactors.
  • Renewable energy and storage are far more cost-effective and faster to deploy than SMRs. NextEra Energy projects that the U.S. renewables and storage market could add 375 to 450 gigawatts of capacity over the next seven years, while it is unlikely any SMR will be operational in that timeframe.

Cite the original document

APA
Schlissel, D., & Wamsted, D. (n.d.). SMRs: Still Too Expensive, Too Slow and Too Risky. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2024-05/SMRs%20Still%20Too%20Expensive%20Too%20Slow%20Too%20Risky_May%202024.pdf
Chicago
Schlissel, David, and Dennis Wamsted. SMRs: Still Too Expensive, Too Slow and Too Risky. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2024-05/SMRs%20Still%20Too%20Expensive%20Too%20Slow%20Too%20Risky_May%202024.pdf.
Wikipedia
{{cite report |last1=Schlissel |first1=David |last2=Wamsted |first2=Dennis |title=SMRs: Still Too Expensive, Too Slow and Too Risky |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2024-05/SMRs%20Still%20Too%20Expensive%20Too%20Slow%20Too%20Risky_May%202024.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001944)}}
BibTeX
@techreport{schlisselndsmrs, author = {Schlissel, David and Wamsted, Dennis}, title = {{SMRs: Still Too Expensive, Too Slow and Too Risky}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2024-05/SMRs%20Still%20Too%20Expensive%20Too%20Slow%20Too%20Risky_May%202024.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001944} }

Full text

Collected · Record updated