Six Insurmountable Business Risks to Keeping Navajo Generating Station Open Past 2019
Summary
This briefing concludes that the Navajo Generating Station cannot be profitably operated after 2019 due to a combination of low natural gas and energy prices, rising production costs, and competition from renewables.
Key insights
- Low natural gas prices at the SoCal Border, which were below $3 per MMBTU in 2017, are expected to remain low for at least nine years, undermining NGS profitability by reducing costs for competing natural gas plants.
- The cost of producing power at NGS increased by approximately 75 percent per-MWh from 2013 to 2017, and has been substantially higher than Palo Verde hub energy market prices over the last three years.
- Renewable energy is providing increasing competition; for example, average levelized wind PPA prices fell from $70 per MWh in 2009 to about $20 by 2016, while solar PPA prices declined by 75 percent in the same period to about $35 per MWh.
- The Western Energy Imbalance Market (EIM) increases access to low-cost California solar generation for NGS owners like APS and NV Energy, but a greenhouse-gas adder likely prevents NGS from selling fossil-fuel power into the California market.
- There is significant uncertainty regarding future customers; the Central Arizona Project (CAP) has stated it does not want to and is not obligated to buy NGS power, and existing owners are only willing to buy limited volumes for short durations.
- Continued operation beyond 2019 requires a National Environmental Policy Act (NEPA) environmental impact statement (EIS) review for both the plant and the Kayenta Mine, a process that typically takes years and could force a temporary shutdown.
Cite the original document
- APA
- Schlissel, D. (2018). Six Insurmountable Business Risks to Keeping Navajo Generating Station Open Past 2019. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Six-Business-Risks-to-Keeping-Navajo-Generating-Station-Open-Past-2019.pdf
- Chicago
- Schlissel, David. Six Insurmountable Business Risks to Keeping Navajo Generating Station Open Past 2019. Institute for Energy Economics and Financial Analysis, 2018. https://ieefa.org/sites/default/files/resources/Six-Business-Risks-to-Keeping-Navajo-Generating-Station-Open-Past-2019.pdf.
- Wikipedia
- {{cite report |last1=Schlissel |first1=David |title=Six Insurmountable Business Risks to Keeping Navajo Generating Station Open Past 2019 |publisher=Institute for Energy Economics and Financial Analysis |date=April 2018 |url=https://ieefa.org/sites/default/files/resources/Six-Business-Risks-to-Keeping-Navajo-Generating-Station-Open-Past-2019.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001940)}}
- BibTeX
- @techreport{schlissel2018six, author = {Schlissel, David}, title = {{Six Insurmountable Business Risks to Keeping Navajo Generating Station Open Past 2019}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2018}, month = apr, url = {https://ieefa.org/sites/default/files/resources/Six-Business-Risks-to-Keeping-Navajo-Generating-Station-Open-Past-2019.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001940} }
Full text
Collected · Record updated